Served from our Tampa office
Home remodeling in Land O’ Lakes, FL
We remodel the kitchens, baths and floors of Land O’ Lakes homes from around 1999, a generation old. Pasco answers every permit and flood question, since no town government exists.
Land O’ Lakes in brief
Pasco County Building Construction Services
Land O’ Lakes is unincorporated; applications go through the county’s PascoGateway portal.
Tampa headquarters
3113 N Armenia Ave, about 17 miles south as the crow flies.
What to know in Land O’ Lakes
A generation old, and owner-occupied
Home remodeling in Land O’ Lakes has no town hall to deal with: the community is unincorporated, so Pasco County is the authority for its building permits, its flood maps and its fees.
More on the houses
A house built in 1999, the Census median here, is now a generation old, and much of what it was built with is due: the kitchen, the baths, the flooring and the water heater. In 82.9 percent of the occupied homes the owner lives at the address, so the people paying for a remodel here are usually the ones who will use the rooms. Its first owners chose finishes for the market of the late 1990s, from cultured-marble vanity tops to almond appliances, and a remodel trades them for the rooms the family uses now.
What Pasco asks for, by kind of project
For Pasco, the dividing line in residential work is whether it adds habitable space. Work inside the existing walls counts as an alteration, and under Ordinance 26-19, in force since July 1, 2026, an alteration that adds nothing to the assessment is spared both of the charges the ordinance sets. A Land O’ Lakes kitchen rebuilt where it stands is that kind of job, whatever its new cabinets and counters cost.
Flood maps, then and now
Pasco County’s first flood insurance rate map dates from November 18, 1981, and the maps in effect today carry a date of June 5, 2020, according to FEMA’s Community Status Book. A house permitted before that date was checked against an earlier map, so a remodel or an addition is read against the current one, and in a community named for its lakes, a lakefront lot is where the newer map most often reaches the house.
More on flood maps
The 50% rule decides when a remodel becomes a substantial improvement, so where the flood map reaches the parcel, the scope is priced against what the structure is worth before design starts.
When the ground settles
Pasco keeps a public record of ground settlement. Its Ordinance 07-04, in force since March 20, 2007, requires an Investigation Permit before anyone tests for settlement under or around an existing house and a Remediation Permit before any repair begins, and it counts subsidence and sinkhole activity as settlement. The county adopted it because a large number of ground settlement insurance claims had pushed up its residents’ property insurance rates.
More on ground settlement
Both stages end on the record. The investigation’s findings, with any remediation they recommend, are recorded in the county’s public records, and so is the report of the repair, with its materials, its cost and any insurer’s payment on the claim; the county also notifies the Property Appraiser’s Office of each permit and posts them to a map layer every month. A house with a past claim carries that history on file, where an owner planning a whole-home renovation can read it before the floors are opened.
A foundation that has been compromised, whether by settling, a sinkhole or other undermining, is repaired under Pasco’s foundation stabilization permit, with a stabilization plan, an analysis engineering report and a completed engineering report, each signed and sealed by a Florida licensed architect or engineer. A crack found in the slab when old tile comes up is where that question starts, and the engineer’s reports, not the remodel’s drawings, are what answer it.
Local rules and records
Sources checked between November 12, 2026 and November 13, 2026
Flood
FEMA’s Community Status Book lists Pasco County (CID 120230B) with an initial FIRM identified 11/18/81, a current effective map date of 06/05/20, and a Community Rating System Class 5 with a 25 percent discount.
Permits
Pasco County’s Residential Additions permit package applies when habitable space is added, such as a second-floor addition, a new back bedroom or a bathroom addition, and requires a FEMA Substantial Improvement Package for properties in a special flood hazard area.
Permits
Pasco County’s Residential Additions package requires a notarized Notice of Commencement, recorded with the Clerk of Courts, when the project is more than $2,500.
Permits
Pasco County’s Residential Foundation Stabilization permit package says the permit is required when the foundation of a property is compromised, for repairs due to settling, sinkholes or other undermining of a residential foundation, and requires a foundation stabilization plan, an analysis engineering report and a completed engineering report, each signed and sealed by a Florida licensed architect or engineer.
- 1.
In Land O’ Lakes CDP the median year homes were built is 1999 (margin of error 2 years) and 82.9 percent of occupied homes are owner-occupied, from ACS 5-year estimates for 2020 to 2024. U.S. Census Bureau, ACS 5-year 2020-2024, tables B25035 (median year structure built) and B25003 (tenure) (opens in a new tab), checked November 12, 2026
- 2.
Pasco County’s mobility fee ordinance (Ordinance 26-19, effective July 1, 2026) exempts alterations that do not increase the assessed mobility fee from both mobility and administration fees. Pasco County, Ordinance No. 26-19, Land Development Code Section 1302.2 Mobility Fees, exemptions (opens in a new tab), checked November 12, 2026
- 3.
Pasco County Ordinance No. 07-04, which created Chapter 17 of the Pasco County Code effective March 20, 2007, requires an Investigation Permit before ground settlement activity under or in the lot area of an existing structure is investigated and a Remediation Permit before any remediation starts, each valid for six months from issuance. Under Pasco County Ordinance No. 07-04, the investigation findings, with any recommended remediation, and the report of remediation activities conducted, with materials, cost and any insurer payments for ground settlement on the parcel, are recorded in the public records of Pasco County, and the county’s procedure notifies the Property Appraiser’s Office of all investigation and remediation permits and posts them to a GIS layer monthly. Pasco County Ordinance No. 07-04 defines settlement to include any subsidence, settlement or sinkhole activity that impairs or has the potential to impair any structure, and says it was adopted because a large number of ground settlement insurance claims within Pasco County had subjected residents to increased property insurance rates. Pasco County Building Construction Services, SOP 17: Ground Settlement Insurance Claims, Investigation and Remediation Permits Ordinance (opens in a new tab), checked November 13, 2026
What we build in Land O’ Lakes
- Home remodeling
- Whole home renovation
- Kitchen and bathroom remodeling
- Condo remodeling
- Remodel design and 3D renderings
- Install flooring
- Tile work installation
- Kitchen remodeling in Land O’ Lakes
- Kitchen design
- Kitchen cabinet installation
- Kitchen countertop installation
- Open concept kitchen remodeling
- Bathroom remodeling in Land O’ Lakes
- Primary bathroom remodeling
- Walk in shower installation
- Tub to shower conversion
- Accessible bathroom remodeling
- Home addition construction in Land O’ Lakes
- Second story additions
- ADU and in law suite construction
- Garage conversions
- Sunroom addition
- Construction management
- Design build construction
- Storm and flood damage rebuilds
- Permits and inspections
- Custom home builder
- New home construction
- Home design and planning
Your office
Call our Tampa office (813) 536-5344
Monday to Friday, 9:00 am to 5:30 pm
A question we hear
Does a Land O’ Lakes addition need a Notice of Commencement?
Yes, once the project is over $2,500. Pasco’s residential additions package wants a notarized Notice of Commencement, recorded with the Clerk of Courts, so the recording goes on the schedule with the addition’s permit.
