Home design and planning in Tampa, FL

Plans, elevations, selections, settled while they are still paper.

We plan your new home’s layout, elevations and selections around your lot, and coordinate the architecture and engineering. Each decision is fixed before the work that depends on it.

Price
Part of the build contract
Dining table under black pendants beside open floating stairs, South Tampa, FL
Modern custom home, South Tampa

What we do

Home design and planning in Tampa settles a new house in three layers, in the order the building will need them. The floor plan, the elevations and the structure come first, then the electrical, plumbing and air conditioning that run through them, then the finishes. Each layer is fixed before the next one leans on it, so a late choice never forces an early one to be redone.

More on what we do

The lot sets the first limits. A survey shows the boundaries, the grade and the trees; zoning sets the setbacks, the height and how much of the lot a house may cover; and on a flood-mapped parcel the base flood elevation fixes the height of the first floor before a room is drawn. The floor is set to the design flood elevation, which Venice describes as the base flood elevation plus the one foot of freeboard the Florida Building Code adds, and the steps, the entry and any garage below the living floor are drawn from that height. The plans that come out of it are the ones the new home construction is permitted and built from.

Some lots add a design review on top of zoning. In Tampa’s Hyde Park Historic District the Architectural Review Commission reviews new construction through a Certificate of Appropriateness, and in a St. Petersburg local historic district new construction always goes to the city’s preservation commission rather than staff approval. In Venice’s Venetian Theme district, by contrast, a new detached single-family home is exempt from the Historic Precedent style the district’s other new buildings must follow.

Deed-restricted communities review the outside as well. Under section 720.3035 of the Florida Statutes, an association can review a structure’s location, size, type and appearance only as far as its declaration or published guidelines allow, and a denial must be in writing, naming the rule and the part of the plan that does not conform. The plans go to its committee while they are still easy to change.

Services we offer

  • Home Design and Planning
Structureand layoutSystemsFinish selectionsEach locked before the stage that depends on it

What's included

  • Home design and planning for a new house on your lot
  • Survey, zoning and flood elevation read before drawing
  • Floor plans drawn around how the household lives
  • Elevations, roof and windows set for sun and wind
  • Structural sheets and energy calculations ready for review
  • Selections priced on paper and ordered ahead of their stage

How a custom home builder project runs, step by step

What it costs and how long it takes

Deposit
In your estimate
The deposit is set in your written estimate, then milestone billing, so payments track completed work.
Timeline
Project-specific
As long as the decisions take, more than the drawing does; a household that knows how it wants to live moves quickly.
Warranty
2 years, in writing
A written workmanship warranty on every qualifying project, with coverage, exclusions and how to make a claim spelled out in your contract.
More on cost and timeline

Design is priced in the same contract as the house it plans, and its share follows the lot’s constraints, the size and number of stories, the engineering the plan needs and the custom pieces in the selections, with the deposit set in your written estimate.

Design and permit review come before any site work, so together they set the start date of a new home. A change made at this stage costs a revision rather than a change order, which is the reason to settle the layout before the selections. On a house you are keeping, the same planning runs through remodel design and 3D renderings.

Before paying for plans from anyone, ask whether they will be drawn to your own survey and your parcel’s zoning, who seals the structural sheets, and whether the energy calculations and the flood elevation documents come with the set. A plan missing any of those is a drawing, not yet a permit set, and the work to finish it is still ahead of you.

What to know

OfficeGuest roomKitchenQuiet roomLivingOpens to the yard

Plans and elevations

The floor plan is drawn around the household: who cooks, who works from home, who comes to stay, which rooms need quiet and where the house should open to the yard.

More on plans and elevations

The elevations then decide how it meets the street and the weather, from the roof pitch and the overhangs that shade the windows to the height of the first floor.

In our Modern Custom Home, the street side and the back were drawn as two different faces: tall black-framed windows in a white front, and covered balconies and wide openings toward the pool behind. Orientation is a design choice in its own right here, because glass facing west takes the full afternoon sun, so overhangs, covered porches and wind-rated glass are drawn in from the first sketch of a custom home.

A new plan is also the cheapest place to provide for later years. A bedroom and a full bath on the ground floor, a curbless shower and wider doorways cost little on paper and far more once the house is finished, as our aging-in-place bathroom page explains.

The yard is planned with the house. A pool and its cage, a screen room, a generator or a shed is placed on the site plan from the start, though in the City of Tampa each takes a permit of its own, and a residential shed of 150 square feet or less is exempt.

WindStrapAnchorFootingSoil

Engineering

Structural engineering turns the plan into one the code will approve: footings suited to the soil, a load path from the roof down to the foundation, and connections and openings rated for the wind at the address.

More on engineering

Doing it while the plan is still moving means a wide opening or a long span is tested once, on paper, instead of redesigned after the first review. Shape and height raise the bar: Pinellas Park, for one, may require structural calculations by a licensed engineer or architect for a building of large size, unusual shape or more than two stories.

The same stage produces what the permit office reads: the structural sheets, the energy calculations and, on a mapped lot, the flood elevation documents. Where an older house stands on the lot, its demolition and the site work are planned in the same set, and once the drawings are approved, filing them falls to our permits manager as part of our permits and inspections work.

Systems are sized from the selections, which is one more reason they come early. Pasco County’s gas permit asks for each gas appliance, the range, water heater, dryer, pool or spa heater and fireplace among them, with its BTU input, so the piping can be sized to the state’s fuel gas code, and a house planned with a backup generator needs its pad, fuel and transfer switch drawn in. In Zonda’s 2025 Cost vs. Value data, a backup generator returned 100.8 percent of its cost at resale in Sarasota.

WindowsCabinetryTileFixturesInstalled

Selections

Selections are what the finished house is made of: flooring, cabinetry, counters, tile, plumbing fixtures, lighting, doors and hardware. They come last in the order, but they are chosen early enough to be priced into the plan and ordered ahead of the stage that installs them, since windows and cabinetry often have the longest lead times.

More on selections

Each one is priced while it is still a choice on paper, so a costlier counter can be weighed against the flooring or the windows instead of turning up on the final invoice. The kitchen, usually the room with the most decisions in it, gets a design pass of its own, the same work our kitchen design does for a remodel.

Exterior selections carry paperwork of their own. Windows, doors, roofing and siding are chosen from products with a Florida Product Approval, which Pasco County, for one, requires in the permit file whenever the work includes them, so the window a design calls for is one the office will accept at the pressure the address demands.

Questions

Can we bring plans from our own architect?

Yes. A set drawn elsewhere is checked against the survey, the zoning and the flood elevation before it is priced, and the engineering and selections pick up from there, so the plans you bring become the ones that are permitted.

Can the design change after the permit is issued?

It can, though it costs time: a change to anything the office approved, such as a wall, a window size or the structure, goes back to the office as a revision, and the work it touches waits for it. Finishes that change nothing structural are easier to swap.

Do we need a survey before design starts?

Yes, and a current one. It fixes the boundaries, the grade, the trees and the property lines the zoning setbacks are measured from, and every line of the site plan is drawn from it.

What does a finished set of house plans include?

A site plan drawn from the survey, a floor plan for each level, exterior elevations, sections showing ceiling heights and wall construction, the structural sheets, the energy calculations and, on a flood-mapped lot, the flood elevation documents. Together they are what the permit office reviews and what the house is priced and built from.

Can our homeowners association review the plans before the county does?

Yes, and it is the better order. Since July 1, 2026, an association or its architectural committee may not require a government building permit before it reviews an owner’s plans, so the committee’s comments can shape the drawings before they are sealed and filed.

Whose daily routine should the floor plan follow?