Engineering
An addition is a structure, not a shed. Foundations, load paths, connections to the existing framing and wind-rated construction are engineered and inspected properly, because in Florida the building code takes wind and water personally.
More on engineering
That engineering is coordinated by us and built by licensed trades, with county or city inspections at every required stage.
The other half of the craft is invisibility. Rooflines that continue rather than collide, siding and windows that match, floors that meet without a step or a seam: these are the details that make an addition read as part of the original home. It is the difference between an addition and an add-on, and it is decided in design, not improvised on site.
Matching starts with what the house is made of. Much of Tampa’s residential core is mid-century concrete block, and an addition to a block ranch goes up in block too, stuccoed so the old wall and the new one read as one. An addition to one of the 1920s bungalows of Seminole Heights or Hyde Park is matched the same way, to the materials that house was built with.
The wind sets the rest. Hillsborough County’s structural criteria for single-family additions start by fixing the building’s risk category and design wind speed, and where that speed is 140 mph or more, the county’s maps decide whether the lot sits in a windborne debris area where every new window, door and skylight has to be protected. Pinellas County sets its design wind speed at 145 mph for ordinary homes, countywide, so the new walls, the roof tie-down and the glass are engineered to it on any addition there.





