Florida sets contractor licensing, lien rights and contract notices by statute, so most of the checks below have a definite answer. We are a general contractor ourselves, and the last section shows how to run the same checks on us.

Know what you are hiring for

Contractors can only give you comparable prices if they bid on the same job. Before you call anyone, write down the rooms, the problems to fix and the finishes you have in mind. If you have not got that far, start with how to plan a home remodel.

The scope also tells you who to call. A job that moves walls or brings in several trades is work for a general, building or residential contractor, who coordinates the trades. A single-trade job, such as a new water heater, can go straight to a licensed specialty contractor.

Check the Florida license

Florida’s licensing law has no ‘remodeling contractor’ category. Remodeling falls under three licenses that cover whole buildings: general contractor (no limit on the type of work), building contractor (buildings up to three stories) and residential contractor (houses with up to three units). Electrical, plumbing, mechanical, roofing, air-conditioning and pool work each have their own licenses.

Every license is public, and checking one takes a few minutes.

  1. 1. Get the license number

    Florida law requires a contractor’s license number on every offer of services, bid, contract and advertisement. If it is missing from the bid, ask for it.

  2. 2. Search it on myfloridalicense.com

    Open the license search of the Department of Business and Professional Regulation (DBPR) and choose Search by License Number, or Search by Name if you only have a company name.

  3. 3. Read the type and status

    The record shows the license type, its status and the date it expires. You want an active license that covers your job: a general, building or residential contractor for a remodel, and the right specialty license for single-trade work.

  4. 4. Match the name to your contract

    A company contracts in Florida through a licensed qualifying agent. The record lists the license holder, any business name and related licenses. The company on your contract should appear there. If it does not, ask whose license the job will run under.

  5. 5. Look at complaints

    The record links to View License Complaint. DBPR keeps a complaint confidential until 10 days after probable cause is found, so a blank page means no public complaint, not that none was ever filed.

If the bid includes electrical, plumbing, mechanical, roofing or air-conditioning work, ask who holds those licenses. Florida requires a general, building or residential contractor to subcontract that work unless it holds the specialty license itself. Search each subcontractor the same way.

Confirm insurance and workers’ compensation

Florida makes liability insurance, property damage insurance and workers’ compensation a condition of holding a contractor’s license. The license record does not show the policies. Ask for certificates of insurance sent to you by the contractor’s insurance agent, and check that the policy dates cover your job.

Workers’ compensation protects you as well as the crew. Florida’s owner-builder disclosure warns that a homeowner may be held liable for injuries to unlicensed workers, and that homeowner’s insurance may not cover them. In construction, an employer with even one employee must carry it. A small company may show an exemption certificate instead, but that exempts up to three corporate officers only, so ask how the rest of the crew and the subcontractors are covered.

Homes built before 1978

A firm paid for work that disturbs paint in a home built before 1978 must be certified under the EPA’s lead Renovation, Repair and Painting rule and work lead-safe. Ask for the certificate. Renovating an old house covers what else an older home can hide.

Talk to past clients and see their work

Ask for two or three clients whose jobs were close to yours in size and type and finished recently, and call them. Photos show finishes. A client tells you how the job was run.

Questions worth asking a past client:

  • Did the job finish on budget and on time? If not, why?
  • How were changes priced and approved?
  • Who was on site day to day, and how quickly did they answer?
  • How did the company handle a problem or a callback?
  • Would you hire them again?

Read reviews on more than one site, such as Google, the BBB and Houzz, and read the company’s replies to the bad ones. How a company answers a complaint in public is a fair preview of how it will answer yours.

Compare bids line by line

Get at least three bids, all written against the same drawings or the same written scope. Then compare them item by item, not by the total.

Compare bids line by line
CheckWhat to look for
ScopeThe same work in every bid. A missing line is work you pay for later.
AllowancesA set amount for a finish not yet chosen, such as tile. Ask what each one buys.
ExclusionsWhat the bid leaves out: design, permits, debris removal, appliance installation, patching and painting.
ScheduleA start date, a length, and what the length assumes.
PaymentsA schedule tied to stages of finished work, not to calendar dates.
PeopleA named project manager, and which trades are subcontracted.

A bid well below the others is usually missing something. Find out what before you count it as a saving.

Read the contract before you sign

The contract should describe the job well enough that a stranger could tell whether it was done. Check that it includes:

  • The scope, tied to drawings and a written list of materials, finishes and model numbers
  • The price, each allowance, and what happens when a selection costs more
  • A payment schedule tied to stages of finished work
  • A start date, an estimated completion date, and what can move them
  • How changes are made: in writing, priced and signed before the work is done
  • Who applies for the permits and whose license goes on them
  • Site protection, cleanup and working hours
  • The workmanship warranty, in writing
  • The contractor’s license number

Florida also requires two notices in almost every residential remodeling contract. One explains the state’s Construction Lien Law. The other explains the Florida Homeowners’ Construction Recovery Fund, which can repay homeowners, up to a limit, who lose money because a licensed contractor broke specific state laws. If either notice is missing, ask why.

Watch the deposit. Under Florida law, a contractor who takes more than 10 percent of the contract price as a first payment must apply for permits within 30 days and start work within 90 days after the permits are issued. The exceptions are just cause or your written agreement to a longer period.

Pay in a way that protects your home

Under Florida’s Construction Lien Law, subcontractors and suppliers who are not paid can claim a lien on your home, even if you have paid your contractor in full. Four documents keep that from happening.

  1. 1. Notice of commencement

    The owner, or the owner’s agent, records it with the county clerk and posts it at the site before the first inspection.

  2. 2. Notices to owner

    Subcontractors and suppliers send these to say they are working on your job. Keep every one. Each sender is someone you need a release from.

  3. 3. Releases of lien

    Before each payment, ask for a written release of lien from everyone who sent you a notice to owner. The lien-law notice in your contract recommends exactly this.

  4. 4. Final payment affidavit

    When final payment comes due, the contractor must give you a sworn affidavit saying whether those subcontractors and suppliers have been paid. Florida law tells you to hold the final payment until you have it.

The lien-law notice calls the law complex and recommends talking to an attorney. On a large job, an hour with a real estate lawyer before you sign is time well spent.

Red flags that should end the conversation

  • Asks you to pull the permit as an owner-builder. Florida’s own owner-builder disclosure warns that this is a frequent practice of unlicensed contractors.
  • Wants cash, or most of the price before any permit is applied for.
  • Pushes you to sign today, or offers a discount that ends with the visit.
  • Will not put the scope, price and schedule in writing.
  • Knocks on your door after a storm with a crew ready to start. Check the license before anyone touches the house.

How to choose a kitchen remodeling contractor

A kitchen brings many trades into one room: plumbing, electrical, range hood ventilation, often gas, then cabinets, countertops and tile. Ask the subcontracting question from the license check first.

Ask who designs it. Some contractors design in house, some build from a showroom’s or an independent designer’s drawings, and some expect you to bring a plan. If one company does both, ask to see the designer’s past kitchens as well as the builder’s: kitchen design is a separate skill from installation.

Ask who orders the cabinets and appliances, who checks them on delivery, and who pays to fix a damaged or wrong item. Cabinet lead time can set the whole schedule, so ask for it in the bid.

Check each bid against the typical ranges in kitchen remodel cost, and see the kitchen remodel timeline for how long the work takes. Our own work is on kitchen remodeling.

Questions about hiring a contractor

Do I need a licensed contractor to remodel my kitchen?

Florida lets you act as your own contractor under the owner-builder exemption, but you must supervise the work on site yourself. Selling or leasing the house within a year of finishing works against you, because the law then presumes it was built for sale. If you hire someone to run the job, that person or company must hold a license for the scope of the work.

Can a contractor licensed in another Florida county work on my house?

A certified contractor holds a state license that is valid anywhere in Florida. A registered contractor’s license rests on a local certificate of competency and is valid only where it was issued. The license record on myfloridalicense.com says which kind it is.

What happens if I hire an unlicensed contractor?

Contracting without a license is a first-degree misdemeanor in Florida, and a third-degree felony for a repeat offense or during a declared state of emergency, such as after a hurricane. A contract signed by an unlicensed contractor cannot be enforced by that contractor. The state’s recovery fund covers losses caused by licensed contractors, so your only remedy against an unlicensed one may be civil court. You can report unlicensed activity to DBPR’s hotline at 1-866-532-1440.

What warranty should a remodeling contractor give?

Ask for the workmanship warranty in writing: what it covers, how long it lasts and how you make a claim. It is separate from the manufacturers’ warranties on products such as windows, fixtures and appliances, which the contractor should hand over when the job is done. Salt & Pepper’s workmanship warranty is two years, in writing.

Run the same checks on us

Salt & Pepper Construction holds a Florida Certified General Contractor license, CGC1535727, and a Florida Certified Plumbing Contractor license, CFC1434279, both issued through DBPR. Search either number on myfloridalicense.com, or see both on our licenses and warranty page.

Ask us for what you would ask anyone else: insurance certificates, recent clients to call and a bid you can compare line by line. Our reviews are a starting point, not a substitute for those calls.

Talk to us about your project

Sources

  1. 1.Florida Statutes (2025), s. 489.105, Definitions (opens in a new tab), checked
  2. 2.Florida Statutes (2025), s. 489.119(5)(b) (opens in a new tab), checked
  3. 3.Florida DBPR, Licensing Portal: License Search (opens in a new tab), checked
  4. 4.Florida DBPR, license detail record (myfloridalicense.com) (opens in a new tab), checked
  5. 5.Florida Statutes (2025), s. 489.128 (opens in a new tab), checked
  6. 6.Florida Statutes (2025), s. 455.225(10) (opens in a new tab), checked
  7. 7.Florida Statutes (2025), s. 489.113(3) (opens in a new tab), checked
  8. 8.Florida Statutes (2025), s. 489.115(5)(a) (opens in a new tab), checked
  9. 9.Florida Statutes (2025), s. 489.103(7) (opens in a new tab), checked
  10. 10.Florida Statutes (2025), s. 440.02 (definitions of employment and employee) (opens in a new tab), checked
  11. 11.US EPA, Lead Renovation, Repair and Painting Program (opens in a new tab), checked
  12. 12.Florida Statutes (2025), s. 713.015 (opens in a new tab), checked
  13. 13.Florida Statutes (2025), s. 489.1425 (opens in a new tab), checked
  14. 14.Florida Statutes (2025), s. 489.126(2) (opens in a new tab), checked
  15. 15.Florida Statutes (2025), s. 713.13 (opens in a new tab), checked
  16. 16.Florida Statutes (2025), s. 713.06(2)(a) and (3)(d) (opens in a new tab), checked
  17. 17.Florida Statutes (2025), s. 489.127(1)(f) and (2) (opens in a new tab), checked
  18. 18.Florida DBPR, Report Unlicensed Activity (opens in a new tab), checked
  19. 19.Salt & Pepper Construction, Licenses, insurance and warranty, checked