These steps apply to any remodel that reaches past one room, from a kitchen and two baths to a whole-home renovation. For a single room, the kitchen remodel timeline and the bathroom remodel planner go further.

Start with what the house needs

Write two lists. The first is what the house needs: leaks, failing systems, rooms that do not work, anything a buyer’s inspector would flag. The second is what you want. Needs get funded first.

Learn the house’s condition before you design. Find out the age of the roof, the electrical panel, the water heater, the air-conditioning system and the plumbing, and look for signs of water damage or termites. Replacing pipes or wiring while the walls are open is simpler than after the new finishes go on.

Decide how long you will stay. If you may sell within a few years, resale matters more, and remodeling ROI shows which projects tend to pay back. If you plan to stay, design for the household you will become, and consider aging-in-place features while you are already building.

Save photos of rooms you like and measure the ones you will change. Both make the first meeting with a designer or contractor far more useful.

Set a budget you can hold

Set one all-in number, not just a construction number. Include design and any engineering, permits, materials, fixtures and appliances. Then add the costs outside the contract: storage, eating out while the kitchen is closed, a place to stay if you move out, and furniture for the new rooms.

For what the work itself typically costs, use the ranges in our kitchen remodel cost, bathroom remodel cost, room addition cost and flooring installation cost guides.

Then hold back a contingency for what the walls hide. FHA’s 203(k) renovation loans require a contingency reserve of at least 10 percent of the repair costs on homes 30 years or older, and up to 20 percent. That is a fair yardstick for any older house. The reserve is money you plan not to spend.

If the budget will not stretch, spend in this order: structure and systems, then layout, then finishes. A countertop or a light fixture is easy to upgrade later. A drain line under a new floor is not.

Paying for it

The usual ways to pay are savings, a home equity loan or line of credit, a cash-out refinance, or a renovation loan such as FHA’s 203(k). If a lender is involved, ask early what it needs from your contractor and when it releases money. Its answer shapes the payment schedule in your contract.

Check the rules that apply to your property

Florida has one statewide building code, enforced by your city or county building department. Your contractor applies for the permits, and plan review becomes part of your schedule. See which remodels need a permit.

If you live in a condo or a community with a homeowners’ association, read the declaration and the rules before design starts. Many require written approval for the work and limit working hours, parking and where materials can be stored. For a condo unit, see condo remodeling.

If the house sits in a FEMA special flood hazard area, the high-risk zone on the flood map, settle the scope with your city or county floodplain administrator before you design, because a project at 50 percent or more of the building’s market value brings the whole house under current floodplain standards (the thresholds each county uses are in the flood zone guide).

If the house is older, read how to renovate an old house before you budget. Older materials and wiring can change both the price and the method.

Decide the order of the work

Doing everything at once means one design, one permit process and one stretch of disruption, and each trade comes once instead of several times. Phasing spreads the cost and lets you live in part of the house, but you pay for some setup and cleanup more than once.

Either way, work from the outside in and from the structure out:

  1. 1. Structure and the outer shell

    Foundation and framing repairs, the roof, windows and exterior doors. These protect everything inside.

  2. 2. Systems in the walls

    Plumbing, electrical and air-conditioning work, which runs through walls and ceilings.

  3. 3. Kitchens and bathrooms

    The rooms with the most trades, built on the new systems.

  4. 4. Floors, trim and paint

    The finishes that run across the house go last, so the other work does not damage them.

Never put a new finish over a system you plan to replace soon. New tile over an old drain line is the classic case.

Finish the design before construction starts

There are two common ways to get a design. A design-build firm designs and builds under one contract, so the price is checked as the design develops. Or an architect or designer draws the plans and you take them to builders for bids, which means separate contracts and more prices to compare.

Either way, ask for a floor plan, drawings of the kitchen and bathroom walls, an electrical and lighting plan, and a written list of every material and finish. Bids are priced from that set of documents, and the finished job is checked against it.

Choose every finish, fixture and appliance before construction starts. A decision made mid-job becomes a change order, and an item ordered late can stop the work while everyone waits for it. Ask for lead times when you choose an item, not when you need it.

Bring in a contractor while the plan is on paper

A contractor who prices the design as it develops keeps it from outgrowing the budget. A builder can also spot what drawings miss, such as a beam in the way or an electrical panel that needs upgrading. Pick one early, using the checks in how to choose a remodeling contractor.

Talk to us about your plans

Build the schedule

A remodel runs in five stages, and each one needs something from you.

Build the schedule
StageWhat happensWhat you do
DesignDrawings, selections and pricingMake the decisions and approve the final plan and price
PermitsThe building department reviews the plansAnswer questions and get any HOA or condo approval
OrderingCabinets, windows, fixtures and other long-lead items are orderedConfirm each selection before it is ordered
ConstructionDemolition, framing, systems, inspections and finishesKeep access open and answer questions quickly
CloseoutFinal inspection and a list of last fixesWalk the job, check the list, and collect warranties and manuals

Ask the building department or your contractor for current plan review times, because they change with workload. Get lead times on ordered items in writing.

The Atlantic hurricane season runs from June 1 to November 30, with most activity between mid-August and mid-October. If the work opens the house, such as a new roof, windows or an exterior wall, ask how the site will be secured when a storm is forecast, and consider timing that work outside the peak.

Mark your own calendar too: holidays, guests, school schedules and travel. You will need to be reachable for decisions and available for walkthroughs.

Plan how you will live during the work

Decide early whether you will stay. Staying works when one bathroom remains usable and you can cook somewhere, even simply. Consider moving out if the whole house is torn up, if someone at home is sensitive to dust or noise, or if the job will cut water or power for days.

If you stay:

  • Keep one bathroom working at all times, and agree which one before demolition.
  • If the kitchen will be out of service, set up a temporary one away from the work.
  • Ask how the work zone will be sealed off from the rest of the house and how dust will be controlled.
  • Agree on working hours, where workers park, and where the dumpster and materials go.
  • Plan for pets and children. A closed door is not a barrier to a curious dog.

Before work starts, empty the rooms being remodeled, cover or store the furniture next to them, and move valuables out of the way. Agree on one point of contact and a regular update, such as a weekly call or site walk.

Questions about planning a remodel

Do I need an architect to remodel my house in Florida?

Not by law for a one- or two-family home or a townhouse. Florida lets people who are not architects prepare plans to build, enlarge or alter those buildings. Your building department still decides what drawings a permit needs, and structural changes, such as removing a load-bearing wall, may need an engineer’s design.

Do I need to tell my home insurance company about a remodel?

Call your agent before work starts. A larger or more valuable house may need more dwelling coverage, and the agent can tell you how the policy treats a house under construction. If the remodel strengthens the roof, windows or doors, ask about a wind mitigation inspection afterward, because Florida requires insurers to offer discounts for features that reduce windstorm loss.

Will remodeling raise my property taxes in Florida?

It can. On a homesteaded house, Florida assesses changes, additions and improvements at just value as of the first January 1 after they are substantially completed. After that, the Save Our Homes cap limits yearly increases in assessed value to 3 percent or the change in the Consumer Price Index, whichever is lower. Your county property appraiser decides what counts as an improvement, so ask before you build.

Sources

  1. 1.US HUD, Standard 203(k) Contingency Reserve Requirements (opens in a new tab), checked
  2. 2.US HUD, 203(k) Rehabilitation Mortgage Insurance (opens in a new tab), checked
  3. 3.Florida Statutes s. 553.73(1) (opens in a new tab), checked
  4. 4.FEMA glossary, Substantial Improvement (opens in a new tab), checked
  5. 5.FEMA, Substantial Damage Quick Guide (opens in a new tab), checked
  6. 6.NOAA National Hurricane Center, Tropical Cyclone Climatology (opens in a new tab), checked
  7. 7.Florida Statutes s. 481.229(1)(b) (opens in a new tab), checked
  8. 8.Florida Statutes s. 627.0629(1) (opens in a new tab), checked
  9. 9.Florida Statutes s. 193.155(1) and (4) (opens in a new tab), checked