Condo remodeling in Tampa, FL

Your unit, your building’s rules.

We remodel condo kitchens, bathrooms and full interiors across Tampa Bay, from the association’s approval to the final walkthrough. Work stays inside your unit and within what the association allows.

Price
Quoted on site

What we do

Condo remodeling in Tampa covers the rooms a house remodel does, kitchens, bathrooms, floors and full interiors, inside a building you share. The unit sits between neighbors above, below and beside it, and the slab, the structure and the pipes that serve other units usually belong to the association. So the work is planned twice: once for the rooms, and once for the building’s approval and its rules.

More on what we do

Inside the unit the remodel runs like a small whole-home renovation: one design across the rooms, one contract and one project manager, with the building’s logistics planned before the work starts.

A condo design moves faster when a few documents are on the table at the first visit: the declaration, which draws the unit’s boundary; the building’s renovation rules and work hours; any flooring rule with the sound rating it asks of an underlayment; the board’s adopted specifications for shutters or impact windows; and the contact for the association’s manager, who receives the scope, the insurance certificates and any contractor registration the building asks for.

In Tampa the condo work gathers close to downtown. In the 33606 ZIP code, which takes in Davis Islands, the Census Bureau counts 49.9 percent of housing units, 5,697 of 11,406, in buildings of five or more units, and downtown itself is mostly condominiums. Both are served from our Tampa headquarters, so a condo remodel in South Tampa or downtown starts with the same two documents: the declaration and the building’s renovation rules.

The order is the same in every building. We walk the unit with you and read the rules, design the rooms, prepare the association’s package and the permit application side by side, then build inside the hours the building allows, through to a final walkthrough of the finished unit.

Services we offer

  • Condo Remodeling
Neighbors aboveYour unitNeighbors belowSlabShared riser

What's included

  • Condo kitchens, bathrooms, floors and full interiors
  • Association paperworkScope, drawings and certificates
  • Work planned around the unit’s boundaries and risers
  • Sound-rated underlayment where the building requires it
  • Work hours, elevator bookings and protected common areas
  • Permits filed alongside the association’s approval

How a home remodeling project runs, step by step

What it costs and how long it takes

Deposit
In your estimate
The deposit is set in your written estimate, then milestone billing, so payments track completed work.
Timeline
Project-specific
The board’s review comes first, sometimes longer than the work; then the hours the building allows decide how many days it needs.
Permits
Alongside the approval
Plumbing, electrical and structural work is permitted by the city or county; the association approves the work as well.
Warranty
2 years, in writing
A written workmanship warranty on every qualifying project, with coverage, exclusions and how to make a claim spelled out in your contract.
More on cost and timeline

A condo remodel is quoted from a walkthrough of the unit and a read of the association’s rules, because the building sets part of the price. Work-hour limits and elevator bookings stretch the schedule, a loading dock far from the unit adds handling, and some associations ask for a damage deposit or added insurance. The rooms in scope and your selections do the rest.

Approval comes before any of it, so the schedule starts from the board’s calendar. After that, a condo kitchen follows the steps of any kitchen remodel and a condo bath those of a bathroom remodel, compressed into the hours the building allows.

What to know

Your plansAssociationApprovedfirst

Approval

Most associations approve a remodel before it starts, and what they ask for is set by your declaration and rules. Chapter 718 of the Florida Statutes says a unit owner may not do anything in the unit that would adversely affect the safety or soundness of the common elements.

More on approval

That is why boards look hardest at work that touches walls, floors and plumbing, and why a review can take longer in one building than in the next. Approval and the permit can run side by side, and as your licensed general contractor we prepare the paperwork for both.

Some changes need more than the board. Under section 718.113(2)(a) of the Florida Statutes, a material alteration or substantial addition to the common elements must follow the procedure in the declaration, and where the declaration is silent, 75 percent of the total voting interests must approve it before it begins. A remodel kept inside the unit’s boundaries rarely comes near that vote; one that reaches into the common elements can.

The permit has a Tampa detail of its own. The City of Tampa files condo unit permits on its commercial applications, and the state’s exemption from building permits for small jobs covers single-family homes only, so it never applies to a unit. Plumbing, electrical and structural work is permitted on the same rules as a house, and most associations want their written approval in hand as well.

Yours to remodelSlab and walls: the association'sUnit boundary

Unit boundaries

Your declaration draws the line between the unit and the common elements, and in many buildings that line runs along the unfinished surfaces of the walls, floor and ceiling. Everything inside it is usually yours to remodel; the slab, the bearing walls and the risers that carry water to other units usually are not.

More on unit boundaries

That line decides what a remodel can touch without asking. Opening the slab, moving a bearing wall or tapping a riser is the association’s to approve, while cabinets, fixtures and flooring inside the line are yours, within the building’s rules. On hurricane protection the statute is plainer: where approval is required, a board may not refuse a unit owner’s installation that meets the specifications the board has adopted.

The boundary decides the kitchen as well as the bath. A range hood duct or a dryer vent through an outside wall cuts into the common elements, so it goes to the association before it is drawn, and work on a valve or a supply line close to a riser can mean shutting off water to the units that riser serves, which the building manager schedules.

In an occupied building, the methods matter as much as the schedule. Dust is contained at the unit door, the hallway and elevator floors are protected, debris leaves by the route and the hours the building sets, and wet work is planned so no water reaches the unit below.

Salt airStorm surge

Coastal condos

Condos along the Pinellas and Sarasota coast live with salt air and storm surge. In 2024 Helene set a record storm surge along the Pinellas coast, and Milton came ashore near Siesta Key two weeks later.

More on coastal condos

George Nagy’s Google review describes the work that followed one of them: a condo flood remodel after Helene that redid the floors, walls, bathrooms and kitchen, the scope of a whole-home renovation inside one unit. Near the water, stainless or coated hardware and moisture-tolerant materials outlast the standard ones.

On the Pinellas beaches a Gulf-front unit’s permit goes to the office of the town its building stands in, alongside the association’s approval, and the permits guide maps which office covers which town.

What homeowners say

“Needed flood work remodel of our condo after Helene.”

George Nagy, flood restorationGoogle review by George Nagy, on our Tampa Google listing (opens in a new tab)

More reviews

Questions

What does the board ask the contractor for?

Usually the scope and drawings, the contractor’s license and insurance certificates, often naming the association, and the planned work hours and elevator bookings. The list is your building’s, so check your association’s rules before the design is final; we prepare the paperwork the board asks for.

Can I move my kitchen or bathroom in a condo?

Sometimes. Fixtures can move only as far as the drain risers and the slab allow, and cutting into the slab or rerouting a shared line needs the association’s approval. The layout is checked against both before design begins.

Can I put tile or wood floors in my condo?

Often, over an underlayment that meets your building’s sound rule, since hard floors carry footsteps into the unit below. Check your association’s rules for the rating it requires before tile or wood is chosen, and the floor is built to it.

Do you renovate condos in St. Petersburg and Sarasota?

Yes. Condo renovation in St. Petersburg runs from our Seminole office, and a unit inside the city is permitted by the City of St. Petersburg. Condo remodeling in Sarasota, from downtown to Siesta Key and Longboat Key, runs from our Sarasota office, with the permit from whichever city, town or county covers the building.

Can you rebuild a condo after flood damage?

Yes. George Nagy’s condo after Helene was that kind of job: floors, walls, bathrooms and the kitchen redone. The rebuild inside the unit runs under one contract, while repairs to the building itself are the association’s to make.

What should I ask a contractor before a condo remodel?

Ask for the license number and look it up: ours is CGC1535727, a state certification valid anywhere in Florida, and the board will check it too. Ask whether the insurance certificates can name your association and come straight from the agent, who runs the job day to day, and how a change is priced once work starts. Here one project manager runs the unit, and a change arrives as a written change order before the work it covers.

Can we stay in the unit while it is remodeled?

Usually, if the work is phased. With two bathrooms, one stays in use while the other is rebuilt, and a temporary setup carries the meals while the kitchen is out. A unit opened to the studs is easier to leave for the loudest weeks, and the building’s work hours decide how long each phase runs.

Have you read your association’s renovation rules yet?