Preparation
As a flooring contractor in Tampa, we check the subfloor before a plank is cut, once the old flooring has come up with any tack strip, glue or underlayment.
More on preparation
On a concrete slab that means flatness and moisture: high spots are ground, low spots filled, and a moisture test shows whether a vapor barrier is needed before wood or vinyl goes down. On a wood subfloor it means loose fasteners, soft spots and squeaks. Damage a leak or termites have left behind is shown to you and priced before the new floor covers it, and a soaked subfloor after a storm is part of a flood damage rebuild.
Baseboards, door casings and transitions are planned with the floor. Doors may need trimming for the new height, and the joints between rooms are placed where they will be least visible.
Paperwork is usually light. The City of Tampa lists replacing floor covering, carpet, vinyl or tile, as work that needs no building permit whatever it costs, and Hillsborough County lists floor coverings among the work that typically needs none; a structural subfloor repair or a moved plumbing line is what changes the answer.






