Skip to content

Remodel design and 3D renderings in Tampa, FL

Walk the new room before the old one comes out.

Our designer plans your Tampa Bay remodel in house and shows it to you in 3D renderings. Changes are made on screen, before anything is ordered or built.

Price
Depends on scope

What we do

Remodel design and 3D renderings in Tampa settle the rooms before anyone builds them. Our designer works through the layout, the cabinetry, the surfaces, the fixtures and the lighting with you, and what comes out of it is the plan the crew builds from and the list of selections the written scope is priced from. It runs in house, under the same contract as the construction, so the drawings never pass between two firms.

More on what we do

3D renderings are pictures of the finished rooms, drawn from that design before construction starts. They show the room as it will look, with its cabinets, surfaces and fixtures in place, which a floor plan leaves to the imagination. Seeing it on screen lets you change it there, and our kitchen design page shows how the same stage settles a kitchen.

When you compare remodelers, ask who draws the plan, who prices it and who builds from it, because some contractors build from a showroom’s or an independent designer’s drawings while others ask the homeowner to arrive with plans already drawn. Here our designer, the written estimate and the crews work from one set of drawings, under one contract and Florida certified general contractor license CGC1535727, so the change you approve on screen is the one priced in the written scope and the one built.

Services we offer

  • Remodel Design and 3D Renderings
Living room open to the dining area and kitchen on wood-look floors, St. Petersburg, FL
Whole home renovation, St. Petersburg

What's included

  • Remodel design in house, under one contract with the build
  • Layouts, cabinetry, surfaces and fixtures planned with you
  • 3D renderings to check proportion and clearance
  • Moved walls and drains drawn and priced, structure engineered
  • One palette carried through every room in the job
  • Permit drawings prepared from the approved design

How a home remodeling project runs, step by step

What it costs and how long it takes

Deposit
In your estimate
The deposit is set in your written estimate, then milestone billing, so payments track completed work.
Timeline
Project-specific
A plan that keeps the layout settles sooner than one that moves walls or drains; it closes when you approve the design.
Warranty
2 years, in writing
A written workmanship warranty on every qualifying project, with coverage, exclusions and how to make a claim spelled out in your contract.
More on cost and timeline

Design comes right after the consultation, before anything is ordered, and how it is charged is set out in your written estimate, with the deposit. The cost of the stage rises with the number of decisions in it: how many rooms the design covers, whether walls, drains or wiring move, and how many selections are still open when it begins.

Cabinet orders and the permit application wait for your approval of the design, so a design settled early is what lets the rest of the schedule begin. Choices you arrive with, a tile you already love or appliances you are keeping, leave the stage less to settle; the kitchen remodel planning guide walks through those decisions in order.

What to know

WalkwayDoor swingVanity

Reading a rendering

A rendering is most useful for proportion and clearance. Look at the walkway between an island and the counters, the swing of a door past a vanity, how close the upper cabinets come to the ceiling and the line where the shower glass stops; if something looks tight in the picture, it will feel tight in the room.

More on reading a rendering

Color and texture are the exception. A screen shows a stone, a tile or a paint differently from the daylight in your house, so it is worth holding real samples in the room before choosing, and reading the rendering for where each finish goes rather than exactly how it looks. Where a tile pattern starts and where its cuts fall is decided on the drawing too, as our tile installation page explains.

A rendering shows surfaces, not what runs behind them. A vent stack, a duct or a drain inside a wall the design removes is found from the attic, the framing and any plans on file, and the picture is finished only once each one has a route, or a slim column where it has to stay.

KitchenLivingWall taken outThe pipe and wiring inside it

Layout changes

Renderings make bigger changes easier to judge: a wall taken out between the kitchen and the living room, a shower where a tub stood, a laundry moved off the kitchen. Each has work behind it that a picture does not show.

More on layout changes

A bearing wall needs a beam sized by an engineer, a moved drain on a slab means cutting the concrete, and both are permitted work, which our permits manager files once the design is approved, as permits and inspections explains.

Each change is priced while it is still on screen, so you can weigh it against a layout that leaves the plumbing where it is. Taking down the wall between a kitchen and a living room has a page of its own, open concept kitchen remodeling, and a tub turned into a shower is our tub to shower conversion work.

The drawings the permit office reads come out of the same design, and since Hillsborough County requires every building permit submission from December 31, 2026 to meet the 9th Edition (2026) of the Florida Building Code, a design drawn now is checked against that edition; the permits guide sets out what each office reviews.

One floorSame doorsSame trim

Larger projects

On a larger remodel, design has to make many rooms read as one house: one palette of floors, trim, doors and hardware, carried from room to room. A whole-home renovation starts from that kind of plan.

More on larger projects

Our whole-home interior remodel in St. Petersburg was designed that way, its master suite, spa bathroom, walk-in closet, library and living rooms rebuilt as one design.

For a house that does not exist yet, design starts earlier, with the lot, the setbacks and the plan itself, and our home design and planning page covers that stage. In both cases the permit drawings, and any engineering, are drawn from the design you approve.

Where the design changes the outside of the house, the exterior drawings are also prepared for the reviews beyond the permit office, such as the Architectural Review Commission in Tampa’s Hyde Park historic district or the Modification Committee in Westchase.

On a house in a mapped flood zone, the design also decides which side of the 50 percent line the project falls on, so on a large remodel that number is weighed while the scope is still a drawing, as the guide to remodeling in a flood zone explains.

What homeowners say

“He also offered helpful solutions and smart alternatives as we planned out different design elements, which made the entire process feel collaborative and stress-free.”

Stanley S, bathroom remodelingBBB review by Stanley S, on the Better Business Bureau (opens in a new tab)

More reviews

Questions

Who designs the remodel?

Our designer, in house, working with you and under the same contract as the build. Structural changes are engineered before the design is final, and the plumbing and electrical are planned with it.

Can we make changes after seeing the renderings?

Yes, that is what they are for. Moving a cabinet or swapping a tile on screen changes a drawing; the same change after the cabinets are ordered changes the order, the schedule and the cost.

Do renderings show the exact colors?

Close, not exact. Screens shift color, so stone, tile and paint are judged from samples in your own light, and the renderings settle where each one goes.

Can we bring our own ideas and photos?

Yes. Photographs, a sketch, a room you liked somewhere else: the design starts from what you bring and is drawn to fit your house, its walls, its plumbing and its light.

Do we need an architect or an engineer for the remodel?

It depends on the address and the work. In unincorporated Hillsborough County, the county’s checklist for residential alterations asks for plans digitally signed and sealed by a Florida registered architect or engineer, with structural details for any change to a bearing wall, a beam or a column. Our designer settles the layout and the selections, and the sealed drawings are coordinated from that design under the same contract.

What should we have ready before the design starts?

How each room is used and what is wrong with it today, photographs of rooms you like, and the exact model and dimensions of any appliance or fixture you are keeping. Plans, a survey or past permits for the house help as well: permit records are public, and work done without one can surface when a wall is opened or the house is sold.

Can the design keep our home’s original character?

Yes. The design can match the existing trim, doors and details, or bring a dated room up to date while keeping it consistent with the rest of the house. In a Tampa historic district, anything that changes the outside is also drawn for the Architectural Review Commission’s Certificate of Appropriateness.

Do you design remodels outside Tampa?

Yes. Design runs from all three offices: our Tampa headquarters for Hillsborough and Pasco, our Seminole office for Pinellas, and our Sarasota office for Sarasota and Manatee counties. Either way, the design starts at a consultation in the house, where the rooms are walked and measured.

What do you most want to see before it is built?

Call us at (813) 536-5344Let’s talk