Construction management in Tampa, FL

One plan, one person to call.

We run construction projects across Tampa Bay as your licensed general contractor, with one project manager accountable for budget, permits and schedule. Changes arrive as written change orders.

Price
In the project scope
The Salt & Pepper Construction crew in black company polos in front of a modern two-story home
The Salt & Pepper crew

What we do

You can judge construction management in Tampa by what it produces. Before work starts: a written scope with the budget set against it, the order the trades will work in, a list of materials with their lead times, and the permit file. During the build: those same documents kept current, so on any day you can see what was finished, what was inspected, what arrives next and which decision is yours to make this week.

More on what we do

At the end: the final inspection passed, the permit closed and the final walkthrough done.

Home renovation project management is that work done on site, day by day. On our projects one project manager carries both from the first day of construction, which is what you hire a general contractor for: one person holding the whole job, not one trade’s piece of it.

Services we offer

  • Construction management
Scope andbudgetTradesequenceMaterials andlead timesPermitfile

What's included

  • Construction managementScope, budget, sequence and permit file
  • Project management on site, from the first day to the final walkthrough
  • Trades booked in order by our scheduling coordinator
  • Permits filed and inspections booked by our permits manager

How a general contractor project runs, step by step

What it costs

Deposit
In your estimate
The deposit is set in your written estimate, then milestone billing, so payments track completed work.
Permits
Pulled by us
Our permits manager files with the city or county, books every inspection as the work reaches it and closes the permit.
Warranty
2 years, in writing
A written workmanship warranty on every qualifying project, with coverage, exclusions and how to make a claim spelled out in your contract.
More on cost

On the projects we build, running the job is priced inside the written scope, and its share follows how much there is to coordinate, which the scope and the schedule set out before work begins.

Review cycles at the permit office often set the early pace of a new home or an addition more than the build does, and your schedule is drawn up with that in mind.

Those cycles differ by address. Dunedin publishes an average of 5 to 7 business days for a residential plan review, and Venice says most single-family reviews take ten to fifteen days, so the same addition can start on a different date in each city once its drawings are filed.

Whoever manages your remodel, a few questions show how it will run: who the one person you call is, and how often that person is on site; how a change reaches you, and whether work on it waits for your signature; how releases of lien are gathered before each payment; and whether the last payment waits for the final inspection.

What to know

PermitsDemolitionRough-inInsulationInspectionDrywallCabinetsCounters

The sequence

A construction project, whether it is a room addition, a kitchen or a new home, runs on a sequence that cannot be shuffled. Permits come before demolition, rough plumbing and wiring before insulation, inspections before drywall, cabinets before counters.

More on the sequence

Each trade waits on the one before it, and materials with long lead times, such as windows, cabinetry and specialty tile, have to be ordered early enough to arrive when their stage begins. A missed order or a skipped inspection costs days or weeks.

Three roles in the office keep that sequence honest behind the project manager: the permits manager, who carries each application through review; the scheduling coordinator, who lines the trades up one behind another; and the designer, whose drawings every trade builds from.

On site, our crews and licensed, insured subcontractors do the work, and the coordinator’s sequence decides who is in the house on a given day, so you know whom to expect. The permit has a clock of its own that the sequence has to respect: Venice and Plant City expect work to start within six months of the permit’s issue, Venice counts a job as active only while it passes an inspection at least every 180 days, and a single-family permit generally expires a year after issue unless the office extends it. A job left idle while back-ordered windows arrive can lose its permit that way.

Materials you buy yourself are scheduled like any others. An owner-supplied fixture or appliance is installed where it suits the plan, but if it arrives late or damaged the schedule moves with it, so its order date goes on the same list as the cabinets and the windows, timed to the stage that installs it.

The code edition is a date to manage as well. Hillsborough County requires every building permit submission to comply with the 9th Edition (2026) Florida Building Code from December 31, 2026, and Bradenton moves to it on January 1, 2027, with the edition set by the date a complete application arrives, so a project filed near the changeover is drawn to the edition it will be reviewed under.

CabinetryTileFixturesWindowsWork beginsLate changes

Budget and changes

Most budgets go wrong through small decisions made late, not through one big surprise, which is why the selections that move money most (cabinetry, tile, fixtures, windows) are worth settling before work begins.

More on budget and changes

Billing follows completed milestones after a deposit set in your written estimate. When something does change, a finish you rethink or a problem behind a wall, the cost and the days it adds arrive as a written change order before anyone acts on it. On a whole-home renovation, with dozens of selections, that order is what keeps the total recognizable.

Communication follows one rule: what happened today, and what happens next. Kristen Kraus’s Google review names her project manager, Jino, who took the time to explain each step of the process, and April Hogan’s says the team kept her updated the whole way.

A change to permitted work goes back to the office as well as to you. Venice’s guidelines put it plainly: a building permit is not a license to exceed the scope of work on the application, and any change must first be approved as a plans change. Moving a wall or a window after approval therefore costs review time on top of the work, and the change order shows both.

The money side of the company has a licensed officer of its own: Jonathan Doron, one of the founders, holds a Florida Construction Financial Officer license in his own name, the license the state issues to the person who answers for a construction company’s finances. Dunedin’s homeowner guide to permits adds a sound rule for any contract: final payment waits until every final inspection has passed and the permit is closed.

BuildingElectricalPlumbingMechanicalEach with its own inspections

Permits

Most construction projects need at least one permit, and many need several: building, electrical, plumbing and mechanical, each with its own inspections.

More on permits

In Florida the permit for an address inside city limits comes from the city, and outside them from the county: the City of Tampa or Hillsborough County, the City of St. Petersburg or Pinellas County, the City of Sarasota or Sarasota County. Our permits manager files with each of them, for jobs run from the Tampa headquarters, the Seminole office and the Sarasota office alike.

We file the applications, answer the reviewers’ comments, book each inspection as the work reaches it and close the permit at the end. An open permit can surface years later when the house is sold, so closing it out is part of finishing the job.

Inspections no longer always mean a wait for a truck: Florida offices must accept inspection requests electronically, the City of Tampa can inspect qualifying trade permits by video, and Venice runs virtual inspections through its VuSpex tool. Skipping the permit is what costs time. In Pinellas Park, work begun without one draws an immediate stop work order and twice the original fee, and anything already covered is opened for inspection before the order is lifted, unless the building official lets an engineer or architect inspect it instead.

What homeowners say

“Shay was our project manager and was very professional and always in constant communication.”

Jeff Rafferty, carport conversionGoogle review by Jeff Rafferty, on our Tampa Google listing (opens in a new tab)

More reviews

Questions

What is the difference between construction management and project management?

Construction management plans and controls the whole project: scope, budget, sequence and permits. Project management runs it day to day on site. On our projects one project manager is responsible for both.

Do I need to hire a project manager for a home renovation?

Not separately when we build it. Hiring us as your house remodeling contractor brings project management with it: a project manager on every project we take on, from the first day of construction to the final walkthrough, backed in the office by our permits manager and scheduling coordinator.

Who will I talk to during the project?

Your project manager, from the first day of construction to the final walkthrough. You hear what happened today and what happens next.

What happens if the budget changes mid-project?

It changes only in writing. A change order shows the cost and the schedule impact, and work on the change starts only after you approve it.

How do I know the subcontractors and suppliers have been paid?

Before each payment, a written release of lien from each subcontractor or supplier who sent you a notice to owner keeps an unpaid one from claiming against the house; our guide to choosing a remodeling contractor covers the rest of Florida’s lien paperwork.

What paperwork should we keep when the project ends?

The permit record showing each final inspection passed and the permit closed, the releases of lien and the contractor’s final affidavit, the written 2-year warranty, and the manufacturers’ warranties for the windows, fixtures, appliances and equipment, which come to you separately.

Who should you be able to call each day?