Permits and inspections in Tampa, FL

Filed, inspected and closed out.

Our permits manager files what each project needs with the city or county, then lines up every inspection the work calls for. No work is covered before its inspection passes.

Price
Priced with the project

What we do

Permits and inspections in Tampa are how a city or county checks work it will never see once the walls are closed. On the projects we build, our permits manager prepares each application, carries it through review and responds to the reviewers’ questions, so you never fill out a form yourself.

More on what we do

Every permit is pulled under our own state licenses, the general contractor license CGC1535727 and, for plumbing, CFC1434279, which makes us the party the inspector deals with.

A remodel that moves a sink or adds a circuit carries trade permits for the plumbing or the wiring. New space carries a building permit as well, with zoning review, sealed structural drawings and energy calculations behind it, which is why the heaviest files belong to home additions, second story additions and ADUs and in-law suites.

The line between permitted and exempt work falls between surfaces and systems. Hillsborough County lists finish work as exempt whatever it costs, so long as no structure is altered, and Clearwater needs no permit for paint, tile or replacing cabinets or fixtures. Since July 1, 2026, state law also exempts small jobs on single-family homes below a set value, but never electrical, plumbing, structural, mechanical or gas work, or any property in a flood hazard area; the owner sends a written request with proof of the work’s value, and splitting a project to fit under the limit is not allowed.

Even exempt work has a step in some cities. Tarpon Springs and Venice want the Building Official’s approval before it begins, Tarpon Springs keeps the stamped exemption posted on site for the length of the job, and there, work done under an approved exemption is not inspected by city staff at all, which leaves its quality to the owner and whoever does it.

Services we offer

  • Permits and Inspections
Rebekah Nieves, permits manager at Salt & Pepper Construction
Rebekah NievesPermits Manager

What's included

  • Permits and inspections for every project we build
  • The right office confirmed from the parcel record
  • Sealed drawings, energy calculations and flood forms filed complete
  • Reviewer comments answered and drawings revised
  • Corrections made and inspections rebooked before work moves on
  • Permits left open by an earlier owner looked up before design

How a construction company project runs, step by step

What it costs and how long it takes

Deposit
In your estimate
The deposit is set in your written estimate, then milestone billing, so payments track completed work.
Timeline
Project-specific
A like-for-like trade permit can be quick; structural drawings go through plan review, and each set sent back with comments adds a round.
Warranty
2 years, in writing
A written workmanship warranty on every qualifying project, with coverage, exclusions and how to make a claim spelled out in your contract.
More on cost and timeline

On our own projects, preparing and filing the permits is part of the job’s written scope. Its share grows with the number of permits the work needs, drawings that need an engineer’s seal, flood-zone paperwork and any extra round of reviewer comments, and the deposit is set in your written estimate.

Review time belongs to the office: Pinellas County, by its own figure, takes about 14 days for a typical residential permit, and other offices run faster or slower with the season and the workload. An addition or a new home draws the longest review, so its schedule counts from the filing date rather than from demolition.

State law now limits that clock, in section 553.792 of the Florida Statutes, which our remodeling permits guide links. For a single-family home under 7,500 square feet, an office using its own plans reviewer has 30 business days from a complete application to decide, some smaller jobs on existing homes get 5 business days, and the permit fee drops 10 percent for each business day the office runs late. Every local fee also carries two state surcharges: 1 percent for the Florida Building Commission and 1.5 percent for the state’s building code board and the Homeowners’ Construction Recovery Fund.

Simple trade work can move faster still. Dunedin says it may issue some permits the day it receives them, such as air conditioning and electrical service change outs, garage door replacements, reroofing and water heater replacements, and Largo can issue window and door permits during the same visit when staffing allows.

What to know

Mailing addressParcelProperty record decidesTown on the envelopeOffice for the parcel

Which office

The parcel decides the office, not the town on the mailing address, so the jurisdiction is confirmed from the property record before anything is drawn. Each office then runs its own system: Hillsborough County takes building applications through HillsGovHub, Pasco County through PascoGateway, and Pinellas County only online, through its Access Portal.

More on which office

What they ask for differs as well. Pasco files work inside the existing square footage as an alteration and anything that grows the house as an addition, each with its own package, and on a flood-mapped lot many offices want flood paperwork with the application: an elevation certificate, or their own substantial improvement form with a cost estimate. Inside its limits the City of Tampa reviews the work rather than Hillsborough County, and the permits guide maps which office covers which town.

Some offices check the contractor before the job. Belleair requires every contractor to hold a state license and register with its Building Department through the town’s portal before applying, Venice asks for a contractor registration with copies of the license and of the workers’ compensation and liability insurance, and Tarpon Springs wants the notarized signatures of both owner and contractor, with a copy of the signed contract, on most applications. Plant City takes a separate application for each permit type, from building and electrical to plumbing, mechanical and gas.

FootingFramingRough-inInsulationFinalEach passes before the next covers it

Inspections

Each inspection has to pass before the next stage covers the work it checks. On an addition the sequence runs from the footing or slab, through the framing and the rough plumbing, wiring and ductwork, to the insulation, and ends with a final for each permit.

More on inspections

Visits are booked as each stage is ready, and the next trade stays off anything not yet passed. The photographs of our modern custom home in South Tampa show one of those stages: the fireplace wall framed against the block walls, before any finish went on. When an inspector writes a correction, it is made and the inspection booked again before the job moves on, and holding that order is part of the construction management of every project.

Some offices add stages of their own. Tarpon Springs requires a signed and sealed tie-in survey showing the lowest floor elevation and the setbacks before a new or added slab is poured, and in its flood zones an Under Construction Elevation Certificate before the work goes vertical and a Finished Construction certificate before the final is scheduled. Belleair asks for its elevation certificate before the framing inspection, and Pinellas Park’s slab inspection checks the compaction of any fill, with a test where it runs deeper than 24 inches.

On inspection day, Venice asks for the permit and its approved drawings to be posted where they can be seen, the work area reachable and any animals restrained, and no wiring, plumbing, ductwork or framing that needs an inspection may be covered before it passes. Most offices work to the same rule, which is why the next trade waits.

Final passedRecord closedLeft openSorted before work starts

Closing out

A permit is finished when its final inspection passes and the office closes the record, and ours are closed before a job is called done. Permits an earlier owner left open, or a room built without one, are a different problem, and they are far easier to sort out before construction than halfway through it.

More on closing out

So the record for the address is read before design; PascoGateway, for one, searches the permits already filed on a Pasco parcel. Unpermitted work can sometimes be brought into the record after the fact if the office can inspect it, which may mean opening a wall or drawing what was built, and on an older house headed for a whole-home renovation, that answer shapes the plan.

Pasco County’s guide to after-the-fact permits shows what that takes for an unpermitted addition: double fees, two sets of signed and sealed engineering, site plans with its setbacks, Florida product approvals for its windows and doors, energy and load calculations, and a licensed contractor for each trade on the permit. Records help on the flood side: Pinellas Park keeps FEMA elevation certificates for every building put up in its floodplain since 1989, and its city map shows whether one is on file for a property.

Questions

Do I need to be home for inspections?

Usually not. An inspector needs to reach the work, not meet the owner, so access is arranged with you before the date, and your project manager tells you how each one went.

What happens if an inspection fails?

The inspector writes up what has to change, the item is corrected, and the inspection is booked again. As the permit holder we answer for the correction, and the stage it covers stays open until it passes.

Who signs the Notice of Commencement?

You do, as the owner, and it is recorded with the county clerk; we prepare it with the rest of the permit file. The permits guide sets out when Florida’s lien law calls for one.

Can we pull the permit ourselves as owner-builders?

Florida allows it, but the owner-builder exemption means supervising the work on site yourself, and selling or leasing the house within a year of finishing works against you, because the law then presumes it was built for sale. If you hire someone to run the job, that person or company must hold a license for its scope, and the permit belongs under that license.

Has anyone checked your address for open permits?