A Land O’ Lakes addition, on ground brought in.

A new room’s raised slab soon passes five cubic yards of fill, and Pasco then wants a fill permit. In the floodplain, that fill must be offset.

Long view of the dining room toward the French doors, St. Petersburg, FL
Home additions, Tampa Bay

The fill under a new pad

Pasco’s fill, drainage and tree affidavit asks how much fill a project brings onto the lot, and anything over five cubic yards needs a Fill Permit Application of its own. A slab room addition raised to meet the house, or the flood elevation, passes that amount quickly: a 15 by 20 foot pad raised one foot takes 300 cubic feet of fill, about 11 cubic yards, before any fill for the walk around it.

That application wants a site plan showing where the fill goes by length, width and height, the drainage on the lot now and any proposed, with arrows for the way the water runs, the existing structures and their setbacks, any body of water, and the flood zone and wetland lines. It marks the easements too, and new fill may not encroach on a drainage easement, which can hold a pad back from the rear or side line it would otherwise reach.

More on fill permit

The form also asks whether fill has already been brought to the property or spread, and whether the site has received a violation notice, so a load of dirt delivered ahead of the permit is the first thing it asks about. The same affidavit records how many trees the work removes and how many stay on the lot.

What to know

Where the pad’s height comes from

How high the pad rises is Pasco’s Land Development Code, Section 1104. On a lot inside the 100-year flood zone, new construction has its lowest habitable floor, or the bottom of its lowest horizontal structural member, at the base flood elevation plus the required freeboard.

More on pad height

The affidavit asks for the base flood elevation from FEMA’s latest map and for the finished floor elevation proposed. The freeboard, the margin above that line, is left blank on the county’s checklist, so its figure is set for the parcel with the county rather than read from the form. Every inch the floor has to sit above the existing grade is fill under the whole pad, so the height decides how many cubic yards the fill permit covers.

Fill in the floodplain is given back

Where the new pad sits in the floodplain, the volume of fill is not the end of it. Pasco’s affidavit says any fill placed within the floodplain must provide compensatory storage volume, and the plans mark the compensatory storage area next to the fill.

More on floodplain fill

The room of earth a pad takes from floodwater is returned elsewhere, by lowering ground that floodwater can reach, so on a low or lakeside Land O’ Lakes lot the addition’s site work digs as well as fills, and the yard’s grades around it change on both counts.

A pad placed outside the floodplain has no storage to return, and its fill is counted only against the five cubic yards that trigger the permit.

Which additions need a pad

A back bedroom or a family room on a slab of its own usually brings fill onto a Land O’ Lakes lot, and so does a garage bay, since each stands on a new pad raised to meet the house or the flood elevation.

More on pad or none

A second floor over the existing rooms takes none, and neither does a screened lanai closed in on the slab it already has, though Pasco still files either one as added habitable space.

A bath built off a bedroom is a pad of its own, small but counted like any other, and our Land O’ Lakes bathroom page covers the county’s paperwork for one.

From the survey to the slab

A Land O’ Lakes addition starts on the lot: we walk it with the owner, note the trees, the low corners and any shoreline, and order a survey.

More on the process

Where the lot is mapped, the survey and FEMA’s map give the base flood elevation, and the finished floor is proposed from it. Our designer draws the room to that floor, the pad’s fill is calculated from the difference, and the affidavit and plans go to Pasco, with a fill permit application beside them when the volume calls for one.

The pad goes down and is compacted before the slab is poured, the walls and roof follow under the county’s inspections, and one project manager walks the finished room with the owner.

Questions for a Pasco addition

Ask how many cubic yards of fill the new pad will take and whether the lot touches the floodplain. Those two answers decide whether a separate fill permit and a compensatory storage area join the job.

More on questions to ask

Ask where the water will go once the pad is raised. The fill application has to show the lot’s drainage as it is and as proposed, and a higher pad changes which way the yard sheds toward the neighbors or the lake.

Ask whether investigators or repair crews have ever been permitted to look under the house. Pasco keeps those findings on file and on a monthly map layer, so they can be read before the footings are drawn.

What it costs

Price ranges
By size
Our room addition cost guide sets out what an addition costs by size and per square foot.
Deposit
In your estimate
The deposit is set in your written estimate, then milestone billing, so payments track completed work.
Changes
In writing
A written change order with the cost and schedule impact before any added work.
Warranty
2 years, in writing
A written workmanship warranty on every qualifying project, with coverage, exclusions and how to make a claim spelled out in your contract.

Questions

Does a second-floor addition in Land O’ Lakes need a fill permit?

Usually not, since a floor built on top of the house adds no pad. It is still a Residential Addition in Pasco’s package, and on a lot inside the 100-year flood zone the county’s elevation rule for substantial improvements can reach the whole house.

Is enclosing a lanai an addition in Pasco?

Yes. Glazed, insulated and cooled, the old lanai becomes a sunroom the family uses year round, and Pasco files that as habitable space added to the house.

Do you build additions in Wesley Chapel too?

We do. Wesley Chapel is Pasco County too, so a new room there meets the same fill and floodplain questions on a low parcel, and the work runs from our Tampa office.

Sources

Sources checked between November 12, 2026 and November 13, 2026

  1. 1.

    Pasco County’s Fill/Drainage/Tree Affidavit says any fill over five cubic yards needs a separate Fill Permit Application and that the affidavit records the number of trees to be removed from the lot. Under Pasco County Land Development Code Section 1104, new construction and substantial improvements or repairs within the 100-year flood zone must have the lowest habitable floor, or bottom of the lowest horizontal structural member, elevated to the base flood elevation plus required freeboard. Pasco County’s Fill/Drainage/Tree Affidavit (revised 01/09/2024) says any fill within the floodplain area needs to provide compensatory storage volume under Land Development Code Section 902.2.G.5, Floodplain Encroachment, and its plan checklist includes the location of the fill area and of the compensatory storage area. Pasco County Building Construction Services, Fill/Drainage/Tree Affidavit (opens in a new tab), checked November 12, 2026

  2. 2.

    Pasco County’s Fill Permit Application (Land Development Code Section 403.6) asks for the fill material and its volume in cubic yards, whether fill has already been brought to the property or spread and whether a site violation notice has been received, and for a site plan showing the location of the proposed fill by length, width and height, existing and proposed drainage improvements, existing structures with property line setbacks, easements (new fill may not encroach into drainage easements), bodies of water, trees within the fill area, arrows for the direction of drainage flow, and the flood zone and wetland delineation lines. Pasco County Building Construction Services, Fill Permit Application (opens in a new tab), checked November 13, 2026

  3. 3.

    FEMA’s Community Status Book lists Pasco County (CID 120230B) with an initial FIRM identified 11/18/81, a current effective map date of 06/05/20, and a Community Rating System Class 5 with a 25 percent discount. FEMA, Community Status Book Report for Florida (opens in a new tab), checked November 12, 2026

  4. 4.

    Pasco County’s Residential Additions permit package applies when habitable space is added, such as a second-floor addition, a new back bedroom or a bathroom addition, and requires a FEMA Substantial Improvement Package for properties in a special flood hazard area. Pasco County Building Construction Services, Residential Additions permit submittal requirements (opens in a new tab), checked November 12, 2026

  5. 5.

    Under Pasco County Ordinance No. 07-04, the investigation findings, with any recommended remediation, and the report of remediation activities conducted, with materials, cost and any insurer payments for ground settlement on the parcel, are recorded in the public records of Pasco County, and the county’s procedure notifies the Property Appraiser’s Office of all investigation and remediation permits and posts them to a GIS layer monthly. Pasco County Building Construction Services, SOP 17: Ground Settlement Insurance Claims, Investigation and Remediation Permits Ordinance (opens in a new tab), checked November 13, 2026

Call our Tampa office at (813) 536-5344Let’s talk