Tub to shower conversion in Sarasota, FL

No rim to climb, on a slab or in a tower.

On a Sarasota slab, a new linear drain can often sit where the old tub emptied. In a condo tower downtown, keeping it there leaves the building’s concrete alone.

The Salt & Pepper Construction crew in black company polos in front of a modern two-story home
The Salt & Pepper crew

Keeping the drain at the tub’s end

A tub empties at its faucet end, and a shower pan can be sloped the same way, toward a linear drain set along that end wall, so the new outlet lands within inches of the old one.

What still changes is the trap. A shower’s drain and trap are generally larger than a tub’s, so the slab is opened around the old one and widened there, rather than trenched across the floor to a drain at mid-floor, the route our Sarasota bathroom page describes for a walk-in shower centered in the room.

More on the drain

The pan is then built over the slab, either a mortar bed sloped toward that end under a waterproof membrane or a one-piece base cut to the alcove’s length.

Keeping the outlet where it was also keeps the job inside the alcove, so the vanity, the toilet and the floor tile outside the curb can stay as they are. That is often what makes a tub to shower conversion the smaller job it is meant to be.

What to know

The curb a tower keeps

Downtown and on Lido Key, a conversion is often in a condo unit with neighbors below, where the floor under the tub is the building’s concrete. A curbless entry needs that concrete recessed, so in a tower the usual answer is a low curb built up on top of the slab, a few inches high, with the drain left at the tub’s end.

More on condo towers

Glass is ordered once the tile is set, since a panel cut to the finished walls fits them, and in a tower it travels up in the elevator on the day the association has booked, as on any condo remodel.

Tile and fixtures in the flood count

Bathroom tile and fixtures are among the costs the city counts toward its 50 percent test, and a tub to shower conversion in Sarasota adds both.

More on flood count

On its own, a conversion adds only the alcove’s tile, the valve, the drain and the glass to that count. Done in the same contract as a kitchen or a renovation of the whole house, its tile and fixtures join one total, and that total is what the city reads.

On a house already close to the line, a conversion added late to a larger contract can be the item that carries the total over it, so it is priced into the scope before the estimate goes to the city.

Inspected before the pan

Inside the city limits, a moved trap or a new valve is permitted plumbing work, and Building & Permitting inspects it before the pan is built over it. The inspector sees the trap and the valve while they are still exposed, so nothing is buried before it has passed.

More on inspections

Outside the limits, in unincorporated Sarasota County, the county issues the permit instead, and our Sarasota office files with whichever of the two holds the address.

What fills the old alcove

A tub alcove already has its three walls, which is why a conversion can stay small: the shower takes the tub’s footprint, and the work stops at the line where the tub’s front edge stood.

More on the alcove

Its walls are stripped, not patched, because the old wall tile began at the tub’s rim and below that height there is only bare framing or block; the alcove is taken back to it, sheathed in a cement or foam backer, and wrapped in a waterproof membrane that laps down into the new pan before any tile is set.

Panels are the other finish: solid-surface or acrylic sheets set over that backer, with no grout to seal, for owners who would rather wipe a shower down than scrub it. Under either finish the waterproofing does the real work, so it is lapped into the pan’s liner at every corner and left bare for the inspector before the first sheet or tile hides it.

The valve, the seat and the glass

A tub valve feeds a spout as well as a head. With the tub gone the spout comes off and its opening is closed, and because the valve body is exposed anyway, an old two-handle valve is worth trading for a pressure-balancing one, which keeps the shower from scalding or chilling when a toilet is flushed elsewhere in the house.

More on valve and glass

Shifted along the long wall toward the open end of the alcove, the valve can be turned on from dry floor while the head warms up, and a handheld on a slide bar beside it serves anyone who showers seated.

Framing for a bench across the back of the alcove, or for a fold-down seat, goes in while the studs are bare, along with blocking where grab bars may hang one day: two parts of an aging-in-place bathroom that cost little before the backer board goes up.

Whether the opening takes glass at all is a choice of its own: a fixed panel over part of it suits an alcove where the spray stays toward the back wall, a hinged door suits one where it does not, and the curb or the slope at the entry holds whatever water gets past.

The order of a Sarasota conversion

After the free consultation and the measurements, our designer settles the pan, the wall finish, the valve trim and the glass with you, and the written estimate prices that one scope and nothing beyond it.

More on the schedule

The permit then goes to the city or the county, whichever holds the address, and once it is issued the tub is cut out and hauled away, the slab opened at the drain, and the new trap and valve roughed in for the inspector, whose sign-off comes before the pan is built, filled to prove it holds, and tiled.

In a condo tower the order gains three steps of the building’s own: the association’s written approval before the permit, the elevator reserved for the day the old tub leaves, and every noisy task kept inside the hours the building allows.

What it costs

Price ranges
By scope
Our bathroom remodel cost guide gives a range for a tub to shower conversion beside the costs of a full bathroom remodel.
Deposit
In your estimate
The deposit is set in your written estimate, then milestone billing, so payments track completed work.
Changes
In writing
A written change order with the cost and schedule impact before any added work.
Warranty
2 years, in writing
A written workmanship warranty on every qualifying project, with coverage, exclusions and how to make a claim spelled out in your contract.

Questions

Do I need a permit to turn a tub into a shower in Sarasota?

In nearly every case, because the conversion changes the trap and usually the valve. That makes it plumbing under permit, issued by the city’s Building & Permitting or by the county depending on the address, and an inspector sees the new trap before the pan buries it.

Can the converted shower be curbless in a Sarasota house on a slab?

Yes, where the slab is the owner’s to cut. The concrete under the old tub is lowered so the pan can start level with the bathroom floor and fall to the drain from there, which takes more demolition than a curbed pan and leaves nothing to step over.

How long does a tub to shower conversion take?

Less than a full bathroom, since the vanity, the toilet and the floor stay put. The working days are spread around the plumbing inspection and the time the glass takes to be cut to the finished tile, and you get the schedule for your alcove at the consultation.

Will the rest of the bathroom be disturbed?

Only at the alcove’s edge, where the strip of floor the tub’s front covered is patched to match the existing tile. The toilet and the sink stay connected and usable through the job, which matters in a house with one bathroom.

What should I ask before hiring someone to convert my tub?

Ask whether the price includes the larger trap and the permit for it, whether the pan is tested with water before the tile goes on, and how the old tub leaves the house, since cast iron is broken up in place. Then ask under whose plumbing license the trap and the valve are set; ours is CFC1434279, and the state’s licensing site shows whether such a license is current.

What does a tub to shower conversion cost in Sarasota?

Our bathroom remodel cost guide prices this job on a line of its own, apart from full remodels. Within it, the price moves with a mortar pan or a one-piece base, tile or panels on the walls, the glass, a new valve, and whether the slab is lowered for a curbless entry.

Sources

Sources checked November 12, 2026

  1. 1.

    The City of Sarasota’s Building & Permitting division, part of Development Services, reviews building plans and inspects residential work inside the city, and online permit submission and inspection requests go through the city’s permitting portal at ftgportal.sarasotafl.gov. City of Sarasota, Building & Permitting (opens in a new tab)

  2. 2.

    In the City of Sarasota, if a home’s lowest floor is below the 100-year flood elevation, a remodel, addition or repair that costs 50 percent or more of the structure’s market value triggers the city’s flood damage prevention rules, which require elevating the building to or above that flood level. The city’s 50 percent cost estimate counts kitchen, utility and bathroom cabinets, bathroom tile and fixtures, built-in kitchen appliances, HVAC equipment, and contractor overhead and profit, but excludes plans, surveys, permit fees, swimming pools, screened pool enclosures, sheds and detached garages. City of Sarasota Building Division, Substantial Improvement or Substantial Damage: Notice to Property Owner (FEMA 50% Rule package, updated 8/2024) (opens in a new tab)

Call our Sarasota office at (941) 294-2718Let’s talk