Cabinets in the city’s flood test
Some houses in the city sit under the 100-year flood level, and for them a kitchen has a ceiling besides the budget. When one project’s cost reaches half the building’s market value, the city’s flood damage prevention requirements take over, and the house must then be raised to that flood level or higher.
More on flood test
Much of a kitchen remodel in Sarasota is on the city’s list of counted costs: the new cabinet boxes, doors and drawers, the dishwasher, the built-in oven and the cooktop, and our overhead and profit with them. Cabinets in a utility room count as well, so a laundry refit in the same job joins the same total, and choosing kitchen cabinets here is partly a flood decision.
The list reaches past the kitchen, too: bathroom tile and fixtures and HVAC equipment are on it, so a kitchen, a bathroom and a new air handler in one contract count as one sum. When the kitchen is one part of a larger job, the whole of it is priced against the building’s value, as in any flood-zone rebuild.
