Tarpon Springs kitchens, approved on paper first.

Under the 2026 state law, Tarpon Springs approves permit-exempt work by written request, the contract attached. The stamped approval stays on site; city staff do not inspect the work.

The Salt & Pepper Construction crew in black company polos in front of a modern two-story home
The Salt & Pepper crew

Exempt work, approved first

Florida’s House Bill 803, signed into law on May 7, 2026 and in effect since July 1, 2026, created limited permit exemptions for certain construction projects at single-family residences. Tarpon Springs attaches a condition to them: property owners and contractors must obtain the Building Official’s approval before they proceed with exempt work.

For a kitchen remodel small enough to qualify, the first step is therefore a request to the city, and its answer comes before anything is taken apart. Which kitchen jobs the exemption takes in is the Building Official’s call, made on the request itself, so the scope is written the way the city will read it: what is replaced, what is new, and what stays exactly as it is.

What to know

A written request, the contract attached

The city’s notice spells out the request. It goes to the Building Official in writing, with documentation describing the proposed work and a copy of the contract, including an itemized cost breakdown. The city’s Permit Exemption Request form asks for the address, the owner or contractor, contact information, the project valuation with supporting documentation for that figure, and a description of the job’s scope, and city staff mark it approved or disapproved.

More on written request

In a kitchen the itemized contract is that supporting documentation. The kitchen cabinets, the counter, the hardware and the labor each appear as a line, and their total is the valuation the form asks for. The scope written on the form is the scope approved, so anything added once the approval is in hand sits outside it and goes back to the Building Official as a request of its own.

The stamped copy, and no inspection

Once the request is approved, a copy stamped by the Building Official stays on site for the whole job, posted where it can be seen and available to the city’s Code Enforcement personnel. The notice warns that failing to keep it there may result in a Stop Work Order, so on a kitchen job it is posted in the room, not left in a truck.

More on stamped copy

Exempt work goes uninspected. The notice is plain that city staff do not inspect what is done under an approved exemption, and that property owners and contractors answer for its compliance with the applicable laws, regulations and building standards. Without an inspection, the record of how the kitchen went together is the installer’s own: the invoices, the product sheets and photographs of the work as it went in.

After Helene: the kitchen’s systems

After the damage and flooding Hurricane Helene caused, the city’s Building Development Department issued a notice under section R322.1.6 of the Florida Building Code, Residential. It says electrical, mechanical and plumbing components and systems are to be located above the base flood elevation plus 1 foot, and that every permit application in a flood prone area receives a plan review and a FEMA review.

More on kitchen systems

A kitchen holds a good share of a house’s systems: the range and refrigerator circuits, the outlets along the counter, the dishwasher and disposal connections, and often the water heater in a closet nearby. Where those are replaced because flood water reached them, the notice says the applications will be required to put the systems above the base flood elevation.

The code text the notice quotes gives the alternatives. Equipment may sit below that height if it is designed and installed to keep water out and to resist flood loads under ASCE 24, and wiring may run below it if it meets the electrical code’s provisions for wet locations. In a ground-floor kitchen below the flood line, which systems go up and which are built for water is settled in the plans under review, before the kitchen design fixes where the appliances stand.

What the exemption leaves out

Tarpon Springs spells out what the exemption cannot cover, and the list takes in most of a kitchen: a house partly or wholly in a flood hazard area, any wiring, piping, ductwork or gas line, and anything structural, which the city reads to include replacing an exterior window or door.

More on exemption limits

That leaves a Tarpon Springs kitchen little to exempt beyond cabinets, counters, hardware and finishes on the existing lines in a house outside the flood zone. A new circuit, a relocated sink, a gas range or a new window puts the whole kitchen back on an ordinary permit.

State law also bars dividing a larger project into smaller ones to dodge the permit, so a kitchen cannot be split into an exempt cabinet job and a later plumbing job to stay under the line.

A permitted kitchen, signed and notarized

A permitted Tarpon Springs kitchen goes in with the owner’s signature and ours both notarized and a signed copy of the contract attached, so the contract is final before the application is, and a scope change after filing means an amended contract as well as amended drawings.

More on permit filing

Where the Heritage Preservation Board or the Board of Adjustment has a say over the house, its letter of approval joins the same file, and the plans themselves are uploaded through GoPost.

What it costs

Price ranges
By scope
Our kitchen remodel cost guide sets out what a kitchen remodel costs in Florida, by scope and by line item.
Deposit
In your estimate
The deposit is set in your written estimate, then milestone billing, so payments track completed work.
Changes
In writing
A written change order with the cost and schedule impact before any added work.
Warranty
2 years, in writing
A written workmanship warranty on every qualifying project, with coverage, exclusions and how to make a claim spelled out in your contract.

Questions

Does the approval rule apply if I do the exempt kitchen work myself?

Yes. Property owners are named alongside contractors, and the request form has one line for either, so a homeowner doing an exempt kitchen job in Tarpon Springs sends the same written request, waits for the same stamp and keeps the same copy on site.

Is a cabinet-only kitchen in Tarpon Springs exempt from a permit?

It can be, in a house clear of the flood map and with no wiring, piping, gas or structural change, but only once the Building Official has approved the written request, and the stamped copy then stays posted on site until the work is finished.

Can a Tarpon Springs kitchen be done in two exempt phases?

No. State law prohibits splitting a larger project into smaller ones to avoid permitting, so the kitchen is scoped and permitted as the one job it is.

Does a Tarpon Springs kitchen bump-out need the new floodplain permit?

Only a bump-out does, and only on a flood-zone lot; the city’s separate floodplain permit covers additions, not a kitchen remodeled within the walls it already has.

Does the Seminole office reach Tarpon Springs?

Yes, with Palm Harbor just to the south on the same office’s list.

Sources

Sources checked between November 12, 2026 and November 13, 2026

  1. 1.

    Under House Bill 803, Tarpon Springs property owners and contractors must obtain approval from the Building Official before proceeding with work that is exempt from a building permit. Tarpon Springs requires electronic plan review submissions through its GoPost portal and stopped accepting emailed submissions on December 31, 2023. Beginning October 1, 2026, Tarpon Springs requires a separate Floodplain Permit for all new construction and additions to existing buildings on property within a designated flood zone. City of Tarpon Springs, Permits & Inspections (opens in a new tab), checked November 12, 2026

  2. 2.

    Tarpon Springs says Florida House Bill 803, signed into law on May 7, 2026 and effective July 1, 2026, creates limited permit exemptions for certain construction projects at single-family residences, and property owners and contractors must obtain approval from the Building Official before proceeding with exempt work. To qualify for a House Bill 803 permit exemption in Tarpon Springs, applicants must submit a written request to the city’s Building Official along with documentation describing the proposed work and a copy of the contract including an itemized cost breakdown. For all approved permit exemptions in Tarpon Springs, a copy of the exemption request stamped and approved by the Building Official must remain on site throughout construction and be available for review by Code Enforcement personnel, and failure to keep it on site may result in a Stop Work Order. Tarpon Springs says work performed under an approved permit exemption will not be inspected by city staff, and property owners and contractors are responsible for ensuring all exempt work complies with applicable laws, regulations and building standards. Tarpon Springs says the House Bill 803 residential exemption does not apply to work on property partially or entirely in a flood hazard area, to electrical, plumbing, mechanical or gas work, or to structural work, including exterior window and door replacements, roofing, soffits and all structural modifications, and that state law prohibits dividing a larger project into multiple smaller projects to avoid permitting requirements. City of Tarpon Springs, New Residential Permit Exemptions under Florida House Bill 803 (PDF) (opens in a new tab), checked November 13, 2026

  3. 3.

    Tarpon Springs’ Permit Exemption Request form asks for the address, the owner or contractor, contact information, the project valuation with supporting documentation for it, and the scope of work, is marked approved or disapproved by city staff, and says the stamped form shall be posted on site and remain visible for the duration of the project. City of Tarpon Springs Building Development Department, Permit Exemption Request form (PDF) (opens in a new tab), checked November 13, 2026

  4. 4.

    A Tarpon Springs Building Development Department notice citing Florida Building Code, Residential, section R322.1.6 says all electrical, mechanical and plumbing components and systems shall be located above the base flood elevation plus 1 foot, that because of the damage and flooding caused by Hurricane Helene all permit applications in flood prone areas will be subject to a plan review and FEMA review, and that applications for those systems presumed to be caused by flooding will be required to raise the systems above the base flood elevation. The section R322.1.6 text in Tarpon Springs’ notice allows electrical, heating, ventilating, air conditioning and plumbing equipment and fixtures below the required elevation if they are designed and installed to prevent water from entering or accumulating within the components and to resist flood loads in accordance with ASCE 24, and allows electrical wiring systems below it if they conform to the electrical code’s provisions for wet locations. City of Tarpon Springs Building Development Department, Replacement of mechanical, plumbing, and electrical systems (notice, PDF) (opens in a new tab), checked November 13, 2026

  5. 5.

    Tarpon Springs’ Building Development Department guide says a building permit application for most construction projects must bear the notarized signature of the property owner and the contractor, together with a copy of the contract or agreement for the work bearing the property owner’s signature. Tarpon Springs’ permitting guide lists letters of approval from the Board of Adjustment and/or the Heritage Preservation Board, as applicable, among the documents required when applying for a city building permit. City of Tarpon Springs Building Development Department, Informational Guide (Guide to Permitting 2026, PDF) (opens in a new tab), checked November 13, 2026

Call our Seminole office at (813) 330-2684Let’s talk