Skip to content

Kitchen remodeling in St. Petersburg, FL

St. Pete kitchens, and the walls behind them.

We open a St. Petersburg kitchen’s wiring, drains and framing before fixing its layout, since the city’s median home dates from 1969. Two of our jobs here rebuilt open-plan kitchens.

Kitchen bar with marble-look counters and a stainless refrigerator, St. Petersburg, FL
Whole home renovation, St. Petersburg

Kitchens in the city’s older half

The Census Bureau’s 2020 to 2024 survey puts the median year built for homes in St. Petersburg at 1969, with a margin of two years. Half the city’s housing is at least that old, so a typical kitchen here sits in a house past fifty.

A kitchen that old may have been updated more than once, but updates tend to stop at what shows. New doors, counters and appliances can sit in front of the circuits, drain lines and studs the house was built with, and those are what decide a new layout.

More on built by 1969

So for kitchen remodeling in St. Petersburg, the drywall in an older home comes off early at the three points a plan rests on: behind the sink, at the range, and in any partition the kitchen remodel would remove. A layout drawn without that is a guess about the house.

What to know

Wiring, drains and framing

Wiring first. A kitchen wired for the house’s first owners was laid out around fewer appliances than a family runs today, and the panel feeding it may have little capacity to spare. Tracing each run back to the panel shows whether the new kitchen needs new circuits only, or a larger panel as well, and that is cheaper to learn while the drywall is already off.

More on inside the walls

Then the drains. A sink that stays put reuses the existing drain, while an island sink needs a fresh line with steady fall back to the main one. On a slab, that line runs through a trench cut in the concrete; over a crawl space, it hangs below the floor joists. Which of the two the house stands on shapes what the move costs.

How open the plan can get is a framing question, because some partitions between a kitchen and a living room only divide the space while others carry ceiling joists or roof load. A wall that carries weight can still go, with a beam in its place, but the beam’s depth decides whether the ceiling stays flat, and only the opened wall shows what it carries. Those answers go into the kitchen design before any cabinet is sized.

A sink island in a whole-home renovation

In one St. Petersburg house we renovated end to end, the kitchen centers on an island with the sink set into it and pendant lights above. White cabinetry, stone counters and a mosaic backsplash line the perimeter, with a breakfast bar and a stainless refrigerator, and nothing separates the kitchen from the living and dining space.

More on sink island

That kitchen is one part of our St. Petersburg whole-home renovation; a light, neutral scheme and matching flooring tie it to the living space past the island. A sink in an island is exactly the move the drain question above has to answer.

A navy island under a plank ceiling

The open-plan home remodel, another St. Petersburg job, centers its kitchen on a navy island with wood stools. White cabinets surround it, and a wood plank ceiling runs overhead. Its living room lies open beyond the island, and the remodel laid wood-look flooring.

More on navy island

One photograph from that job shows the new white cabinets going in. An island that faces a living room is seen from every side, so its back is finished like its front, and the outlets it needs come up through the floor, which raises the slab or crawl space question a moved sink does.

When the kitchen reaches the rest of the house

Rewiring and replumbing an older kitchen seldom end at its doorway. The panel asked to take extra circuits feeds the whole house, and the drain behind the sink may share its line with a bath or laundry beyond the partition. When either one is replaced, the rooms that share it become part of the decision.

More on past the kitchen

Each St. Petersburg kitchen pictured here came out of a wider renovation. A kitchen done by itself begins with the same exposed framing; in a whole-home renovation, the difference is how far beyond it the fresh wiring and pipe travel.

A condo kitchen stops at the unit’s boundary instead. Its plans go to the association for sign-off ahead of demolition, its noisy work keeps to the hours the building’s rules allow, and its sink is placed where the building’s common drain line can still reach it. Our St. Pete Beach condo, in the beach city west of St. Petersburg, has a kitchen we remodeled; condo remodeling explains the approval.

A kitchen window in a historic district

Inside a St. Pete house in a local historic district, or one designated a local landmark, the cabinets, stone and lighting are the owner’s choice alone, but the window over the sink and any new hood vent are exterior alterations, and each requires a Certificate of Appropriateness before work starts.

More on district windows

Most such kitchen changes stop with the city’s preservation staff, who can sign off an application that meets the standards; the commission hears the bigger cases, from new buildings to demolitions.

Because a replacement sash there must match the historic window’s size, shape and light pattern, a kitchen plan hoping for a wider window over the counter is redrawn around the existing frame, and the cabinets on that wall are sized to it.

Flood-zone kitchens and the 49 percent line

In a St. Pete kitchen near the water, the city’s 49 percent rule is kept in view from the first sketch, because the cabinets, stone and appliances are added to every other repair and improvement in the total compared with the structure’s value.

More on 49 percent

A recent independent appraisal can lift the value that total is measured against, so on a large waterfront kitchen we raise the question before the kitchen design is priced rather than after.

How a St. Petersburg kitchen job runs

From our Seminole office, a St. Pete kitchen begins with a free visit at which the drywall behind the sink, at the range and in any partition is opened early, and the price comes only once the wiring, drains and framing behind those three points are known.

More on job steps

The Construction Services and Permitting Division then reviews the electrical, plumbing and wall changes, its inspectors see them before the drywall goes back, and the kitchen countertop installation comes after the cabinets are fixed. Ask any bidder how they will learn what is inside the walls before they give you a fixed price, and what happens to that price if an opened wall turns up more than anyone expected; for a St. Petersburg kitchen of ours, the answer is a change order in writing, approved before any extra work starts.

What it costs

Price ranges
By scope
Our kitchen remodel cost guide sets out what a kitchen remodel costs in Florida, by scope and by line item.
Deposit
In your estimate
The deposit is set in your written estimate, then milestone billing, so payments track completed work.
Changes
In writing
A written change order with the cost and schedule impact before any added work.
Warranty
2 years, in writing
A written workmanship warranty on every qualifying project, with coverage, exclusions and how to make a claim spelled out in your contract.

Questions

Can a St. Pete kitchen be opened to the living room?

Usually, once the wall between them is open and its load is known. A partition that only divides the rooms comes out with its wiring rerouted. One that carries the ceiling or the roof is replaced by a beam, and where a dropped beam would hang too low, a flush beam set into the ceiling framing does the same work at more cost.

What does older wiring add to a St. Petersburg kitchen?

New circuits for the appliances the old ones cannot carry, and sometimes a larger panel to feed them. Neither can be priced exactly from the cabinet faces, so in an older St. Pete home that line of the estimate firms up once the drywall is off.

Can I move the sink in my St. Pete condo kitchen?

Inside the unit, often; once the new drain path would cut into what the declaration treats as common property, its procedure governs, and a declaration that is silent leaves the change to 75 percent of the owners’ votes.

Does a kitchen in a St. Pete historic district go before the preservation commission?

Only if it alters the outside, and even then the city’s preservation staff can approve most kitchen windows and vents that meet the standards, leaving the commission the larger cases.

Are the original cabinets in an older St. Pete house worth keeping?

Sometimes. Site-built or solid-wood boxes from a house’s first decades can be refinished and fitted with new hinges and drawer slides, while later particle-board runs rarely repay the effort; which kind a kitchen has is clear once a door comes off.

Which office serves St. Petersburg kitchens?

Our Seminole office takes them on, and because St. Petersburg runs its own building department, the city rather than Pinellas County reviews and inspects the work.

Sources

Sources checked November 12, 2026

  1. 1.

    Homes in St. Petersburg have a median year built of 1969, with a margin of error of 2 years (2020-2024 American Community Survey). US Census Bureau, American Community Survey 5-year estimates 2020-2024, table B25035 (Median Year Structure Built), St. Petersburg city, Florida (opens in a new tab)

  2. 2.

    74,915 of the 119,244 occupied homes in St. Petersburg are owner-occupied, which is 62.8 percent (computed from the survey counts and rounded to one decimal). US Census Bureau, American Community Survey 5-year estimates 2020-2024, table B25003 (Tenure), St. Petersburg city, Florida (opens in a new tab)

  3. 3.

    In a FEMA Special Flood Hazard Area, St. Petersburg applies a 49 percent rule: when the cumulative cost of repair or improvement equals or exceeds 49 percent of the structure’s market value, the whole structure must be brought into full compliance with current zoning, building and floodplain rules, which can include elevating it, using flood-resistant materials and adding flood venting. St. Petersburg estimates market value for the 49 percent rule from the structure’s tax assessment value from the Pinellas County Property Appraiser, and an owner who disagrees can submit an independent appraisal by a state-licensed appraiser completed within the last 12 months. The City of St. Petersburg says staying in compliance with the National Flood Insurance Program rules protects the 25 percent discount on NFIP flood insurance premiums that currently applies to all residents of the city. City of St. Petersburg, letter to property owners: Permit Requirements for Storm Damage Repairs and Resources for Property Owners (November 1, 2024) (opens in a new tab)

  4. 4.

    In a St. Petersburg local historic district or on a local landmark, any exterior alteration, including changes to walls, roof or windows and additions, needs a Certificate of Appropriateness under City Code Section 16.30.070 before work starts. In a St. Petersburg local historic district, projects that would go to the Community Planning and Preservation Commission can qualify for staff approval if the Historic Preservationist finds the application meets all standards, except new construction and additions of 250 square feet or more, demolitions, relocations and small cell wireless facilities. For a window replacement in a St. Petersburg local historic district, the city’s Certificate of Appropriateness checklist requires impact-resistant glass, Energy Star qualification for southern climate zones, and the same size, shape and light configuration as the historic window. City of St. Petersburg, Certificate of Appropriateness Application Package (Historic and Archaeological Preservation Overlay, City Code Section 16.30.070) (opens in a new tab)

  5. 5.

    Under Florida condominium law, a condominium declaration controls material alterations or substantial additions to common elements, and if the declaration is silent, 75 percent of the total voting interests of the association must approve them before work starts. Florida Senate, 2025 Florida Statutes, section 718.113 (Maintenance; limitation upon improvement; display of flag; hurricane shutters; display of religious decorations) (opens in a new tab)

Call our Seminole office at (813) 330-2684Let’s talk