Drywall, read from the contract
Drywall follows the same logic, by what else the job holds. Manatee’s list lets old drywall be replaced with new and no permit, as long as the contract includes no work on load bearing walls, no work on structures within flood hazard areas, and no plumbing, electrical or air conditioning work.
More on drywall test
A rebuilt bathroom seldom passes, because the wall behind the shower is opened to reach the valve, a vanity moved along the wall takes its supply lines and drain with it, and a light over the mirror is new wiring. With any of them in the contract, the drywall that closes those walls becomes permitted work along with them, and the pipes and wires inside are inspected while the walls are still open.
Where the contract really is drywall alone, a ceiling patched after an old leak or a wall refinished around a mirror that stays, the list leaves it without a permit; a shower remodel that moves the valve always brings its drywall onto one.
