What goes in at the studs
Blocking comes first: lengths of lumber fixed between the studs wherever a grab bar may one day go, beside the toilet, along the shower wall and at the tub. Fitted now, it costs a few boards and an hour; fitted after the tile is set, it means cutting into the finished wall.
More on at the studs
A curbless entry, with the shower floor pitched to a linear drain, lets a walker or a shower chair roll straight in, and it is built into the floor structure while the floor is open. A fold-down seat or a built-in bench gets its framing at the same stage, while the wall cavity is still open.
The doorway is the last framing job: widening it, or hanging a pocket door that never swings into the bath, is simple with the drywall off. The aging-in-place plan adds the fixtures: a handheld shower on a slide bar, lever handles, and a valve placed where it can be reached from outside the spray.